VOCPA
Design Supply Installation Testing Commissioning of Korkai Retreat Project at VOC Port Tuticorin Tamilnadu
2025_VOCPT_256577_1
33CE / RCMBMR/2025-26/D.3711
Open Tender
Civil Works - Buildings
90 days
VOC Port
Please refer tender document
6 documents required · 6 mandatory
₹0
₹19.3 L
10 Feb 2026
24 Nov 2025
24 Dec 2025
24 Nov 2025
23 Dec 2025
24 Nov 2025
SCHEDULE A-Tents with Plinth-Providing Plinth for 2 Nos Royal Tent made with Iron Frame work. (size 40ft x 40ft = 1600 Sqft). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers.
Providing the Tented Accommodation: Royal Luxury Swiss Cottage Tents (2 Nos) size 36 ft x 36 ft (with tropical appearance of tent) - to be built over a wooden platform of atleast 1 ft height. Luxurious Cottage tents (temporary structure) with plywood flooring furnished with The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officersmajestic interiors and spectacular exteriors, air- condition, carpeting,running hotwater,24-hour powersupply, pedestal fan and allfurnishing.All tents shall be of size (1300 sqft) withonebedroom with all furniture, one lounge area with sofa set, one dining arrangement with allfurniture’s,tea / coffee maker, dressing room, attached bathrooms (One WC toilet), pedestal fan, AC & heater, flat screen TV, non- alcoholic mini bar, luxury toiletries, front seating area, fire alarm and good quality of curtains (including shower curtain in bathroom). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Iron Frame Work Plinth for 8 Nos Deluxe Tents (26 ft x 18 ft) made with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Tented Accommodation: Deluxe Swiss Cottage Tents 8 Nos (24ft x16ft) (temporary structure) with air-condition, carpeting, furniture, hotrunningwater,24- hour power supply, pedestal fan, etc. - to be built over a wooden platform of at least 1 ft height. All tents shall be of size (380 sq. Ft) including bedroom (twin bed), attached bathroom (WC toilet), toiletries and spacious front porch with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers.
Providing Plinth for PODS 10 Nos (size 24ft x 24 ft) made with Iron Frame Work with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers.
providing Pods / Wooden Chalets (10 Nos): The sleeping pod shall be 20 feet x 20 feet x 10 feet (in height). The interior space, while compact, aims to maximize comfort and functionality within these constraints. The material should be water proof and it should be able to stand the wind pressure.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
SCHEDULE B- B- Facility and Service Area Providing Conference Hall Facility with facade with attached toilets (M&F) ( 150pax) Size (66ft x 66ft x 12ft). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Air Conditioned Restaurant & Bar with façade (50ft x 50ft x 12ft). with attached toilets (M & F). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Air Conditioned Reception (50ft x 50ft x12ft) with facade with attached toilets (M & F). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Infrastructure for Adventure Activity (20ft x 20ft x 12 ft). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Business centre (12ft x 10ft) with 5 desktops, one photocopier cum scanner cum printer with internet access.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Kitchen to supply to the cafeteria (Size 40 ft x 32 ft x 12 ft) with all the modular kitchen facilities.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Creating Kids Playing Area ( 40 x 40 x 12 ft) with necessary kids play equipemnts as approved by the departmental oficers.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Domentry 6 Nos (each 4000 Sqft) for Staff (Including Toilet). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Senior Staff Tent (3 nos) in affordable size including attached toilet facilities.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Storage Area (50ft x 20 ft x 12 ft). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
SCHEDULE C- Mechanical, Electrical, Plumbing Work-Providing Plumbing Works ( Including STP plant) Sewage line and Water supply for all the Area of Tent annex and all the allied works. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing all the electrical Work, General Lighting with passage lighting-150W- 400W LED FloodLight) and Decorative / Theme lightalong withpole,fixture, lamp,junction boxetc, Necessary cable andallsupporting hardware etc. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing the Transfomer of approved brand and capacity to support the complete Tent area strutures. Cost including cost of for the nearby tapping point of Ports Power supply, cables from source etc and Fixing cost.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Water Connection facilities from the supply mains of the Ports. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing RO Plant of approved and adequate capacity with Storage facilities. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing EPBX Setting in Reception, Dining, Control Room & other Structures. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Fire Extinguishers 10KG (CO2&ABC) - 30 Nos. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Fire Extinguishers 5 KG (CO2 &ABC)- 30 Nos. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Silent Genset 125 kva (3 Nos) of leading /approved brand.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Horticulture & Landscaping & Plantation in the entire areas of Tent annex, The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing and fixing Fire alarm systems in each room & structure with hooters and main panel in reception etc. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Wiremesh / Picket fencing around the tent location. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing C.C pavered Pathway in the tent annex as per the approved paln and design, The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
SCHEDULE D Other Amenities Providing and fixing Entry Gate / Thematic craft witheco-friendly material etc.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Indoor & Outdoor Games facilities ( Chess , Pool , Carom , Volleyball, Badminton, Paint ball Archery, etc). The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Stage and seating arrangements Area with Sound and decorative Lights etc. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Installation of CCTV Camera Survilllence System covering the entire tents area with all setup and facilities. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Flags posts in all the required area with colour flags in a decorative manner. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Insalltion of Umbrella / shade element of approved design and pattern. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Shacks (Size 10 x 10m) With Raised Platform of 1.50 Ft Height, Carpeting, Furnishing & Furniture,Kitchen Area with Water Connection, Proper Drainage and Power Supply etc. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Golf Cart and Wheel chair facilities 2 nos. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing & Supplying Wheelchairs. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Themetic Installation as per the approved desigin and pattern. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Providing Watch Tower (2 Nos) with required height with furniture arrangments. The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Creation of Website, Social Media Pages and Booking Engine including maintenance etc.The cost including with all the necessary men and materials, cost for everything required. Complete as per the standard procedures and as directed by the departmental officers
Branding and Signages. The cost including with all the necessary men and materials, cost for everything required. C
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
tenderdoc.pdf
Tender Documents • 1.43 MB
BOQ_295851.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid