| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 CrAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹12.8 Cr+₹18.4 L (1.46%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹13.0 Cr+₹36.9 L (2.92%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹12.4 Cr
EMD Value
₹6.3 L
Closing Date
28 Jan 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Construction of Academic Block in Government Siddha Medical College at Palayamkottai in Tirunelveli District.
2025_PWD_518558_1
18(2)SE/2024-25 dated 07.01.2025
Open Tender
Civil Works - Buildings
Lump-sum
510 days
Palayamkottai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.3 L
21 Apr 2025
14 Jan 2025
29 Jan 2025
14 Jan 2025
28 Jan 2025
14 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring, strutting and bailing-out of water wherever necessary, re-filling the sides of foundation with excavated earth in layers of 15cm thick well rammed and compacted, depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 meters and lift of 2 meters and clearing and levelling the site etc., complete with standard specifications. | 1,314 | M3 | 294.22 | ₹3,86,605.08 |
| 2 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with an intinal lead of 10 mts and initial lift of 2mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 282 | M3 | 139.61 | ₹39,370.02 |
| 3 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 212 | M3 | 44.99 | ₹9,537.88 |
| 4 | Supplying and filling the foundation and Basement with Stone dust in layers of not more than 15cm.thick well watered,rammed and consolidated etc, complete complying with Standard specification and as directed by the Departmental officers. | 133 | M3 | 292.5 | ₹38,902.5 |
| 5 | Supplying and filling in foundation, basement, etc with filling Crushed stone sand in layers of not more than 15 cm thick Without consolidation etc. complete complying with standard specification and as directed by the departmental officers. | 3 | M3 | 1,459.22 | ₹4,377.66 |
| 6 | Supplying and filling the basement with conveyed earth with a lead of 5.00 kmmr in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 59 | M3 | 233.37 | ₹13,768.83 |
| 7 | Cement Concrete 1:5:10 (One Cement, Five Crushed stone sand (M-Sand)and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 83 | M3 | 5,038.24 | ₹4,18,173.92 |
| 8 | Providing Anti-Termite Treatment to soil adjacent and under building foundation, plinth periphery of the building by application of chemicals of IS 6313 part I to IV in stages to suit the progress of work consist as per the detailed specification as below (Measurements taken for the plinth area for the purpose of payment) including breaking of termite mounds, making holes with crow bar, closing the holes after the treatment and including cost of chemicals, labour charges transport and storing etc., complete (The chemical should be got approved by the Executive Engineer before use on works) | 805 | M2 | 136 | ₹1,09,480 |
| 8.01 | Stage-1: Spraying anti-termite chemical solution for the foundation before laying concrete in bottom and sides of foundation. | - | - | - | - |
| 8.02 | Stage-2: Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
160764620.xls
BOQ Document • 0.56 MB
160764622.pdf
Tender Document • 0.59 MB
PQdocumentSiddhaABlock.pdf
Tender Document • 0.76 MB
Tendercondition.pdf
Tender Document • 2.93 MB
160764627.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .