Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-Finance | ₹20.6 L | L1 | Accepted-Finance ok |
| 2 | L2₹22.3 LAccepted-Finance | ₹22.3 L | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | AQUA GASEOUS CONTROLS (INDIA) L1 | DEV ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Deployment of 10 Nos. of unskilled labours in each shift required for removal of floating material manually & with electrically operated bar screens and other allied works as per site requirement. The six points where labour required to taking out the floating at HP WW -I/II as follows:-
1. Coarse bar screen at intake CLC
2. Main bar screen 3. Manual bar screen at Ph-I 4. Manual bar screen at Ph-II 5. Fine bar screen at Ph-I 6. Fine bar screen at Ph-II
The engagements of no. of labours in each shift can vary as per site requirement. Arrangement of all personal protective safety measures as per site requirement on not less than minimum wage rate of Govt of NCT Delhi, strictly complying to all statutory requirements for a period of 81 days(35Person x26 shifts x2 Months +17x35) = 2415 Nos. | 2,415 | Nos. | 18,25,740 ₹18.3 L | 19,88,511 ₹19.9 L |
| 2.00 | ESI @3.25% on minimum wage as per present requirement & EPF @13.00% on 15000 Per month. | 2,415 | Nos. | 2,36,670 ₹2.4 L | 2,36,863.2 ₹2.4 L |
Tender Value
Refer Docs
EMD Value
₹44,500
Closing Date
28 Feb 2026, 2:30 pmClosed
Executive Engineer (EnM)HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Removal of floating material manually by labour at different bar screens installed at RWPH of WTP Haiderpur Phase-I and II up to 20.05.2026.
2026_DJB_287473_4
NIT 14 (2025-26)/HP-I
Open Tender
Miscellaneous Works
81 days
EE(EnM)HP-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB
₹44,500
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
Deployment of 10 Nos. of unskilled labours in each shift required for removal of floating material manually & with electrically operated bar screens and other allied works as per site requirement. The six points where labour required to taking out the floating at HP WW -I/II as follows:- 1. Coarse bar screen at intake CLC 2. Main bar screen 3. Manual bar screen at Ph-I 4. Manual bar screen at Ph-II 5. Fine bar screen at Ph-I 6. Fine bar screen at Ph-II The engagements of no. of labours in each shift can vary as per site requirement. Arrangement of all personal protective safety measures as per site requirement on not less than minimum wage rate of Govt of NCT Delhi, strictly complying to all statutory requirements for a period of 81 days(35Person x26 shifts x2 Months +17x35) = 2415 Nos.
ESI @3.25% on minimum wage as per present requirement & EPF @13.00% on 15000 Per month.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_380893.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid