| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC | L1 | Accepted-AOC This work is Allotted to L1 Agency | |
| 2 | L2₹20.6 L+₹2.1 L (11.6%)Rejected-Finance | L2 | Rejected-Finance Due to Higher Rate |
Tender Value
₹25.2 L
EMD Value
₹50,358
Closing Date
25 Feb 2026, 5:00 pmClosed
ANKIT VASHISHT
MC CHARKHI DADRI
Construction of street Munni to Satish kumar, Church Wali, Vijender to Sandeep, Rakesh Mann To Naresh Ward 19 and Vijay to Udham Singh and Balbir saini to 40 futta road Ward 17
2026_HRY_503433_1
2026F3976BB6 2C1A 46F9 8F46 A1914656757B341ULB
Open Tender
Civil Works
Works
180 days
Charkhi Dadri
2 documents required · 2 mandatory
₹2,500
₹50,358
Yes
24 Mar 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 17.6-Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications.
HSR Rate(Rs.) 184.00 Through Rate | 1,921.12 | cum | 184 | ₹3,53,486.82 |
| 2 | HSR Item 9.57.3-Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 3. 150 mm diameter
HSR Rate(Rs.) 269.00 Through Rate | 100 | Metre | 269 | ₹26,900 |
| 3 | HSR Item 17.15.1-Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material
HSR Rate(Rs.) 911.00 Through Rate | 355.82 | cum | 911 | ₹3,24,153.84 |
| 4 | HSR Item 22.206.1-Constructing brick masonry road gully chamber 45x45x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand ) with precast R.C.C. vertical grating complete as per standard design : 1. With common burnt clay non-modular bricks of class designation 7.5
HSR Rate(Rs.) 3284.00 Through Rate | 10 | Each | 3,284 | ₹32,840 |
| 5 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | 500 | Kg. | 83 | ₹41,500 |
| 6 | HSR Item 21.93.1-Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including
setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1.
Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening
HSR Rate(Rs.) 1155.00 Through Rate | 12 | Each | 1,155 | ₹13,860 |
| 7 | HSR Item 17.69.2-Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect.
HSR Rate(Rs.) 655.00 Through Rate | 2,337.37 | Sqm | 655 | ₹15,30,976.7 |
| 8 | HSR Item 7.21.2-Brick work with common burnt clay non- modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) HSR Rate(Rs.) 3968.00 Through Rate | 44.81 | cum | 3,968 | ₹1,77,814.02 |
| 9 | HSR Item 17.5.3-Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications
HSR Rate(Rs.) 7.00 Through Rate | 2,337.37 | Sqm | 7 | ₹16,361.58 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_582128.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .