Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹16 L
Closing Date
28 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
This Public Tender is floated for Earth Work and Culvert Jobs in Railway Reach from Ch 0- Take off Pt
20000258-HD-10157
20000258-HD-10157
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹16 L
28 Jul 2020
7 Jul 2020
28 Jul 2020
28 Jul 2020
8 Jul 2020 - 22 Jul 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD — EARTHWORK IN ALL SOIL IN ALL CONDITIONS AND CLASSIFICATIONS OF SOIL EXCEPT ROCK: EARTHWORK WITH INDETERMINATE LEAD IN NEW LINES, DOUBLING, PROJECTS ETC, EARTHWORK IN CUTTING (CLASSIFIED) IN FORMATION, TROLLEY REFUGES, SIDE DRAINS, LEVEL CROSSING APPROACHES, PLATFORMS, CATCH WATER DRAINS, DIVERSION OF NALLAH AND FINISHING TO REQUIRED DIMENSION AND SLOPE TO OBTAIN A NEAT APPEARANCE TO STANDARD PROFILE INCLUSIVE OF ALL LABOUR, MACHINE AND MATERIAL AND REMOVING AND LEADING ALL CUT SPOILS EITHER TO MAKE SPOIL DUMP BEYOND 10 M FROM CUTTING EDGE OR FOR FILLING IN EMBANKMENT WITH ALL LEAD WITHIN THE SECTION LIMIT, LIFT, ASCENT, DESCENT, LOADING, UNLOADING, ALL TAXES/ROYALTY, CLEARANCE OF SITE AND ALL INCIDENTAL CHARGES, BAILING AND PUMPING OUT WATER, IF REQUIRED, ETC. COMPLETE AS PER DIRECTION OF THE ENGINEER-IN-CHARGE. THE WORK IS TO BE EXECUTED AS PER LATEST/UPDATED EDITION OF GUIDELINES FOR EARTHWORK IN RAILWAY PROJECTS ISSUED BY RDSO, LUCKNOW. CUT TREE SHALL BE PROPERTY OF RAILWAYS AND TO BE DEPOSITED IN THE RAILWAY GODOWN UNLESS SPECIFIED OTHERWISE IN THE SPECIAL CONDITIONS OF CONTRACT.(I) ALL USABLE EARTH ARISING FROM CUT SPOILS SHALL BE LED INTO BANK FORMATION AND UNUSABLE SPOIL SHALL BE DUMPED/STACKED.(II) ALL HARD ROCK/AND BOULDER NOT FIT FOR FILLING WILL BE STACKED BY THE CONTRACTOR AND WILL BE PROPERTY OF THE RAILWAY/HPCL. | - | Cubic Meters |
| 2 | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD — EARTHWORK IN SOFT ROCK,SOFT ROCK NOT REQUIRING BLASTING IN ALL CONDITION: EARTHWORK WITH INDETERMINATE LEAD IN NEW LINES, DOUBLING, PROJECTS ETC, EARTHWORK IN CUTTING (CLASSIFIED) IN FORMATION, TROLLEY REFUGES, SIDE DRAINS, LEVEL CROSSING APPROACHES, PLATFORMS, CATCH WATER DRAINS, DIVERSION OF NALLAH AND FINISHING TO REQUIRED DIMENSION AND SLOPE TO OBTAIN A NEAT APPEARANCE TO STANDARD PROFILE INCLUSIVE OF ALL LABOUR, MACHINE AND MATERIAL AND REMOVING AND LEADING ALL CUT SPOILS EITHER TO MAKE SPOIL DUMP BEYOND 10 M FROM CUTTING EDGE OR FOR FILLING IN EMBANKMENT WITH ALL LEAD WITHIN THE SECTION LIMIT, LIFT, ASCENT, DESCENT, LOADING, UNLOADING, ALL TAXES/ROYALTY, CLEARANCE OF SITE AND ALL INCIDENTAL CHARGES, BAILING AND PUMPING OUT WATER, IF REQUIRED, ETC. COMPLETE AS PER DIRECTION OF THE ENGINEER-IN-CHARGE. THE WORK IS TO BE EXECUTED AS PER LATEST/UPDATED EDITION OF GUIDELINES FOR EARTHWORK IN RAILWAY PROJECTS ISSUED BY RDSO, LUCKNOW. CUT TREE SHALL BE PROPERTY OF RAILWAYS AND TO BE DEPOSITED IN THE RAILWAY GODOWN UNLESS SPECIFIED OTHERWISE IN THE SPECIAL CONDITIONS OF CONTRACT.(I) ALL USABLE EARTH ARISING FROM CUT SPOILS SHALL BE LED INTO BANK FORMATION AND UNUSABLE SPOIL SHALL BE DUMPED/STACKED.(II) ALL HARD ROCK/AND BOULDER NOT FIT FOR FILLING WILL BE STACKED BY THE CONTRACTOR AND WILL BE PROPERTY OF THE RAILWAY/HPCL. | - | Cubic Meters |
| 3 | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD — EXCAVATION ON 1:3:6 GRADE OF PCC. | - | Cubic Meters |
| 4 | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD | EXCAVATION IN EARTH WORK 11871-MADURAI NEW IRD — EARTHWORK IN VERY HARD ROCK, IN ROCK AND VERY HARD ROCK WITH HAMMER/CHISEL/PAVEMENT BREAKER ETC. WHERE BLASTING IS NOT PERMITTED DUE TO SPECIAL CIRCUMSTANCE AND IF SPECIFICALLY ORDERED IN WRITING INCL. DRILLING AND ALL INCIDENTAL WORK IN ALL CONDITIONS: EARTHWORK WITH INDETERMINATE LEAD IN NEW LINES, DOUBLING, PROJECTS ETC, EARTHWORK IN CUTTING (CLASSIFIED) IN FORMATION, TROLLEY REFUGES, SIDE DRAINS, LEVEL CROSSING APPROACHES, PLATFORMS, CATCH WATER DRAINS, DIVERSION OF NALLAH AND FINISHING TO REQUIRED DIMENSION AND SLOPE TO OBTAIN A NEAT APPEARANCE TO STANDARD PROFILE INCLUSIVE OF ALL LABOUR, MACHINE AND MATERIAL AND REMOVING AND LEADING ALL CUT SPOILS EITHER TO MAKE SPOIL DUMP BEYOND 10 M FROM CUTTING EDGE OR FOR FILLING IN EMBANKMENT WITH ALL LEAD WITHIN THE SECTION LIMIT, LIFT, ASCENT, DESCENT, LOADING, UNLOADING, ALL TAXES/ROYALTY, CLEARANCE OF SITE AND ALL INCIDENTAL CHARGES, BAILING AND PUMPING OUT WATER, IF REQUIRED, ETC. COMPLETE AS PER DIRECTION OF THE ENGINEER-IN-CHARGE. THE WORK IS TO BE EXECUTED AS PER LATEST/UPDATED EDITION OF GUIDELINES FOR EARTHWORK IN RAILWAY PROJECTS ISSUED BY RDSO, LUCKNOW. CUT TREE SHALL BE PROPERTY OF RAILWAYS AND TO BE DEPOSITED IN THE RAILWAY GODOWN UNLESS SPECIFIED OTHERWISE IN THE SPECIAL CONDITIONS OF CONTRACT.(I) ALL USABLE EARTH ARISING FROM CUT SPOILS SHALL BE LED INTO BANK FORMATION AND UNUSABLE SPOIL SHALL BE DUMPED/STACKED.(II) ALL HARD ROCK/AND BOULDER NOT FIT FOR FILLING WILL BE STACKED BY THE CONTRACTOR AND WILL BE PROPERTY OF THE RAILWAY/HPCL. | - | Cubic Meters |
| 5 | FELLING TREES 30-60CM | FELLING TREES 30-60CM — FELLING TREE OF GIRTH (MEASURED AT A HEIGHT OF 1 METER ABOVE GROUND LEVEL) INCLUDING LEAD AND STACKING OF MATERIAL WITHIN 100 METER. NOTE : 1. WHEN STUMPS ARE GRUBBED UP IN ADDITION, THE RATE SHALL BE DOUBLED FOR TREES CUT AND GRUBBED. 2. PAYMENT FOR GRUBBING SHALL ONLY BE MADE WHERE SPECIALLY ORDERED, 3. GRUBBING SHALL BE ORDERED ONLY WHERE IT IS ESSENTIAL TO REMOVE THE STUMPS, INCLUDING THE ROOTS, AS PER SPECIFICATION. 4. GRUBBING SHALL INCLUDE REMOVAL OF ROOTS OF TREES AND SAPLINGS TO A DEPTH OF 60 CM BELOW GROUND LEVEL OR 30 CM BELOW FORMATION LEVEL OR 15 CM BELOW SUB GRADE LEVEL, WHICHEVER IS LOWER (GIRTH OVER 30 CM AND UPTO 60 CM). | - | Each |
| 6 | FELLING TREES 60CM-1.5M | FELLING TREES 60CM-1.5M — FELLING TREE OF GIRTH (MEASURED AT A HEIGHT OF 1 METER ABOVE GROUND LEVEL) INCLUDING LEAD AND STACKING OF MATERIAL WITHIN 100 METER. NOTE: 1, WHEN STUMPS ARE GRUBBED UP IN ADDITION, THE RATES SHALL BE DOUBLED FOR TREES CUT AND GRUBBED, 2. PAYMENT FOR GRUBBING SHALL ONLY BE MADE WHERE SPECIALLY ORDERED. 3. GRUBBING SHALL BE ORDERED ONLY WHERE IT IS ESSENTIAL TO REMOVE THE STUMPS, INCLUDING THE ROOTS, AS PER SPECIFICATION. 4. GRUBBING SHALL INCLUDE REMOVAL OF ROOTS OF TREES AND SAPLINGS TO A DEPTH OF 60 CM BELOW GROUND LEVEL OR 30 CM BELOW FORMATION LEVEL OR 15 CM BELOW SUB GRADE LEVEL, WHICHEVER IS LOWER [GIRTH OVER 60 CM AND UPTO 1.5 METER]. | - | Each |
| 7 | FELLING TREES 1.5-3M GIRTH | FELLING TREES 1.5-3M GIRTH — FELLING TREES OF GIRTH (MEASURED AT A HEIGHT OF 1 METER ABOVE GROUND LEVEL) INCLUDING LEAD AND STACKING OF MATERIAL WITHIN 100 M. NOTE: 1. WHEN STUMP ARE GRUBBED UP IN ADDITION, THE RATES SHALL BE DOUBLED FOR TREES CUT AND GRUBBED. 2. PAYMENT FOR GRUBBING SHALL ONLY BE MADE WHERE SPECIALLY ORDERED. 3. GRUBBING SHALL BE ORDERED ONLY WHERE IT IS ESSENTIAL TO REMOVE THE STUMPS, INCLUDING THE ROOTS, AS PER SPECIFICATION. 4. GRUBBING SHALL INCLUDE REMOVAL OF ROOTS OF TREES AND SAPLINGS TO A DEPTH OF 60 CM BELOW GROUND LEVEL OR 30 CM BELOW FORMATION LEVEL OR 15 CM BELOW SUB GRADE LEVEL, WHICHEVER IS LOWER [GIRTH OVER 1.5 UPTO 3 METER]. | - | Each |
| 8 | FELLING TREES OVER 3M | FELLING TREES OVER 3M — FELLING TREES OF GIRTH (MEASURED AT A HEIGHT OF 1 METER ABOVE GROUND LEVEL) INCLUDING LEAD AND STACKING OF MATERIAL WITHIN 100M. NOTE : 1. WHEN STUMPS ARE GRUBBED UP IN ADDITION, THE RATES SHALL BE DOUBLED FOR TREES CUT AND GRUBBED. 2. PAYMENT FOR GRUBBING SHALL ONLY BE MADE WHERE SPECIALLY ORDERED. 3. GRUBBING SHALL BE ORDERED ONLY WHERE IT IS ESSENTIAL TO REMOVE THE STUMPS, INCLUDING THE ROOTS, AS PER SPECIFICATION. 4. GRUBBING SHALL INCLUDE REMOVAL OF ROOTS OF TREES AND SAPLINGS TO A DEPTH OF 60 CM BELOW GROUND LEVEL OR 30 CM BELOW FORMATION LEVEL OR 15 CM BELOW SUB GRADE LEVEL, WHICHEVER IS LOWER [GIRTH OVER 3 METER] | - | Each |
| 9 | CONDUTING DETERMINATION 11871-MADURAI NEW IRD | CONDUTING DETERMINATION 11871-MADURAI NEW IRD — CONDUCTING DETERMINATION OF CALIFORNIA BEARING RATIO AS PER IS 2720. | - | Each |
| 10 | TRANSPT OF LEADING | TRANSPT OF LEADING — TRANSPORTATION: LEADING BALLAST, KANKAR, BRICKBATS, STONE-CHIP, SHINGLE, STONE BOULDER, BLOCK KANKAR, PITCHING STONES, RUBBLE STONES, LATERITE, COAL, SURKHI, DRY MORTAR, SAND, MOORUM, EARTH, MANURE OR SLUDGE, ASHES, LIME, DEBRIS, MUCK, MALBA, ETC. FOR LEAD UP TO 25 KM. NOTE: LEAD UNDER THIS ITEM IS PAYABLE WHEN THE SAME EXCEED 500 METER. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000258-HD-10157.pdf
TENDER_DOCUMENT • 10.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .