| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98.6 LAdmitted-Finance GOFANAGAR TAPAN DAKSHIN DINAJPUR | DINAJPUR DAKSHIN | WEST BENGAL | 733101 | -0.01% | ₹98.6 L | L1 | Admitted-Finance |
| 2 | L2₹99.6 L+₹99,562.03 (1.01%)Admitted-Finance | +1.00% | ₹99.6 L+₹99,562.03 (1.01%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 Cr+₹2.0 L (2.01%)Admitted-Finance | +2.00% | ₹1.0 Cr+₹2.0 L (2.01%) | L3 | Admitted-Finance |
Tender Value
₹98.6 L
EMD Value
₹2.0 L
Closing Date
2 Mar 2026, 2:00 pmClosed
DG(WS),KMC
THE KOLKATA MUNICIPAL CORPORATION OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY) 5, S. N. BANERJEE ROAD, KOLKATA-700013
CUTTING, LOADING, UNLOADING AND TRANSPORTATION OF SILT WITHIN A RANGE 0-5KM AND 5 -10 KM FROM GRWW SLUDGE POND NO-2
2026_KMC_998868_1
KMC/WS/GRWW/T-40/2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
GRWW SLUDGE POND AREA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.0 L
20 Jul 2026
3 Feb 2026
4 Mar 2026
3 Feb 2026
2 Mar 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 10,800 | CUBIC METER | 119.27 | ₹12,88,116 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 10,800 | CUBIC METER | 192.38 | ₹20,77,704 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out
water as required complete (c)Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 7,200 | CUBIC METER | 234.7 | ₹16,89,840 |
| 4 | LOADING, UNLOADING AND STACKING BY MANUAL
MEANS:LOADING INTO TRUCKS AT THE LIFTING POINT,
UNLOADING AT DESTINATION, STACKING PROPERLY IN GODOWNS OR YARD ETC. AS DIRECTED INCLUDING CARRIAGE BY HEAD LOAD UPTO A LEAD OF 50.00 M AT EACH OF THE TWO POINTS (B) EARTH | 28,800 | CUBIC METER | 77 | ₹22,17,600 |
| 5 | COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING
(2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR
MISCELLANEOUS MATERIALS OVER PUCCA ROAD. | 864 | CUBIC METER | 93 | ₹80,352 |
| 6 | PWD ROADS & BRIDGE SCHEDULE, 2018, PAGE-230, ITEM NO-1.08
COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING (2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR MISCELLANEOUS MATERIALS OVER PUCCA ROAD.( 5-6 KM). | 576 | CUBIC METER | 101.2 | ₹58,291.2 |
| 7 | PWD ROADS & BRIDGE
SCHEDULE, 2018, PAGE-230, ITEM
NO-1.08 COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING (2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR MISCELLANEOUS MATERIALS
OVER PUCCA ROAD.(ABOVE 6 KM TO 7 KM). | 576 | CUBIC METER | 109.4 | ₹63,014.4 |
| 8 | PWD ROADS & BRIDGE
SCHEDULE, 2018, PAGE-230, ITEM
NO-1.08 COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING (2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR MISCELLANEOUS MATERIALS
OVER PUCCA ROAD.(ABOVE 7 KM TO 8 KM | 288 | CUBIC METER | 117.6 | ₹33,868.8 |
| 9 | PWD ROADS & BRIDGE
SCHEDULE, 2018, PAGE-230, ITEM
NO-1.08 COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING (2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR MISCELLANEOUS MATERIALS
OVER PUCCA ROAD.(ABOVE 8 KM TO 9 KM) | 288 | CUBIC METER | 125.8 | ₹36,230.4 |
| 10 | PWD ROADS & BRIDGE
SCHEDULE, 2018, PAGE-230, ITEM
NO-1.08 COST OF CARRIAGE EXCLUDING LOADING AND UNLOADING (2) CARRIAGE OF LIME, SURKI, CINDER AND SIMILAR MISCELLANEOUS MATERIALS OVER PUCCA ROAD. (ABOVE 9 KM TO 10 KM) | 288 | CUBIC METER | 134 | ₹38,592 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 0.09 MB
TB40.pdf
Tender Documents • 1.49 MB
BOQ_2446065.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .