Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-Finance 25 A RR SAMY LANE KATTOOR COIMBATORE 641009 | COIMBATORE | COIMBATORE | TAMIL NADU | 641009 | ₹44.1 L | L1 | Accepted-Finance BEING LOWEST TENDER. L1 |
| 2 | L2₹46.5 L+₹2.5 L (5.56%)Rejected-Finance NO 1C C L C WORKS ROAD NEW COLONY CHROMEPET CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | ₹46.5 L+₹2.5 L (5.56%) | L2 | Rejected-Finance BEING NOT LOWEST TENDER. |
| 3 | L3₹47.1 L+₹3.0 L (6.81%)Rejected-Finance | ₹47.1 L+₹3.0 L (6.81%) | L3 | Rejected-Finance BEING NOT LOWEST TENDER |
| 4 | L4₹47.8 L+₹3.7 L (8.48%)Rejected-Finance THE JEHOVAH SHALOM 21 THIRUMALAISAMY STREET LAKSHMI NAGAR EXTN KAVUNDAMPALAYAM COIMBATORE 641030 | COIMBATORE | COIMBATORE | TAMIL NADU | 641030 | ₹47.8 L+₹3.7 L (8.48%) | L4 | Rejected-Finance BEING NOT LOWEST TENDER |
| 5 | L5₹48.8 L+₹4.7 L (10.7%)Rejected-Finance | ₹48.8 L+₹4.7 L (10.7%) | L5 | Rejected-Finance BEING NOT LOWEST TENDER |
| Sl No | Description | Qty | Unit | LAKSHMI ELECTRICAL ENTERPRISES L2 | KUMAR AGENCIES L4 | SUPER COOL L7 | P Natesan and Co L8 | devan enterprises L6 | rvelectricals L1 | Neptune Engineers and Builders L10 | p.chinnasamy L5 | Lucky Enterprises L9 | NAVEEN ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to transformer after disconnecting incoming HT connection and out going LT cable connection, draining out the transformer oil and keep in safe custody for reuse, disconnecting the breather assembly, temperature gauge, taking out the top cover of transformer 630 KVA, outdoor type, 11KV/ 433Volt, step down, disconnecting LT/ HT winding connections from LT/ HT Bushing and carefully taking out LT/ HT Bushing insulator and HT/ LT Brass spindle, taking out gaskets of LT/ HT Bushings and transformer top cover. Refixing exisiting LT/ HT Brass spindle with Bushing insulators after replacing Gaskets, view glass of conservator tank, refixing all cable connections, top cover with new gasket, breather/ temp gauge, refilling transformer oil, complete all as specified and as directed by Engineer-in-Charge | 1 | EACH JOB | 35,000 ₹35,000 | 34,000 ₹34,000 | 40,000 ₹40,000 | 33,900 ₹33,900 | 38,000 ₹38,000 | 31,000 ₹31,000 Lowest | 73,000 ₹73,000 | 36,000 ₹36,000 | 44,600 ₹44,600 | 33,008 ₹33,008 |
| 1.01Notes: (i) Transformer oil for topup, dehydration/ filtration etc shall be measured and paid separately. (ii) Complaints regarding Transformer shall be given in person or through telephone by AGE/JE E/M round the clock (ie 24 Hrs x 7 days). (iii)The contractor shall attend the complaint immediately and shall report the Engr-in-Charge/ JE(E/M) after completion. | |||||||||||||
| 1.02(iv) Penalty of Rs 5000.00 per Job shall be applicable to the contractor, if the complaint is not attended immediately. Note that this penalty is exclusively other then the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract and shall be enforce above as and when delay in individual job is noticed and no claim whatsoever on this account shall be entertained by the Deptt. | |||||||||||||
| 1.03(v) In case the nature of job is such that the work cannot be completed within a period of 6 hrs then the same shall be brought to the notice of the GE/Engr-in-Charge and the period for the completion of the complaint shall be decided by the GE/EIC and the same complaint shall be completed with in the period decided by the GE/EIC.The penalty of Rs 5000/ per Job shall also be applicable to the contractor for non-completion of complaint with in stipulated time decided by the GE/EIC. | |||||||||||||
| 1.04(vi) Transportation charges for transportation of transformer from site to workshop and after repair, workshop to site shall be borne by the contractor and cost thereof including tools and plants shall be deemed to be included in the quoted rate. (vii) Transformer oil shall be drained out in mild steel drum of suitable capacity, which has to be arranged by the contractor. The said drained out transformer oil shall be refilled in the transformer duly dehydrated after repair and the cost for the same shall be included in the quoted rate | |||||||||||||
| 1.05(viii) Testing of transformer after repair shall be carried out as per IS 2026 (Part 1): 2011 at site in the presence of Engr-in-Charge/ JE and the cost of testing shall be deemed to be included in the quoted rate. (ix The IR value of the dried winding before inserting the core in the shell shall be measured and recorded. (x) The decision of the Accepting Officer in this regards shall be final and binding. | |||||||||||||
| 2.00 | All as per item No. 1 here-in-before, but for transformer capacity 500 KVA | 1 | EACH JOB | 32,000 ₹32,000 | 33,000 ₹33,000 | 38,500 ₹38,500 | 31,900 ₹31,900 | 38,000 ₹38,000 | 28,500 ₹28,500 Lowest | 63,000 ₹63,000 | 35,000 ₹35,000 | 41,320 ₹41,320 | 32,508 ₹32,508 |
| 3.00 | All as per item No. 1 here-in-before, but for transformer capacity 400 KVA | 2 | EACH JOB | 30,000 ₹60,000 | 32,000 ₹64,000 | 38,000 ₹76,000 | 29,900 ₹59,800 | 37,500 ₹75,000 | 26,500 ₹53,000 Lowest | 63,000 ₹1,26,000 | 33,000 ₹66,000 | 39,850 ₹79,700 | 32,158 ₹64,316 |
| 4.00 | All as per item No. 1 here-in-before, but for transformer capacity 315 KVA | 1 | EACH JOB | 28,000 ₹28,000 | 31,500 ₹31,500 | 38,000 ₹38,000 | 29,900 ₹29,900 | 37,000 ₹37,000 | 25,500 ₹25,500 Lowest | 62,000 ₹62,000 | 31,000 ₹31,000 | 36,500 ₹36,500 | 31,258 ₹31,258 |
| 5.00 | All as per item No. 1 here-in-before, but for transformer capacity 160 KVA to 250KVA | 2 | EACH JOB | 25,000 ₹50,000 | 31,000 ₹62,000 | 35,000 ₹70,000 | 29,900 ₹59,800 | 30,000 ₹60,000 | 20,500 ₹41,000 Lowest | 60,000 ₹1,20,000 | 28,500 ₹57,000 | 35,600 ₹71,200 | 30,555 ₹61,110 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
6 Jul 2026, 6:00 pmClosed
GE AF
KANGAYAMPALAYAM
REPAIR /MAINT OF POWER SUPPLY/DISTRIBUTION SYSTEM (ATC SUB-STATION, MAFI I AND II SUB-STATION, FMS SUB STATION, LCA SUB-STATION, DWR S/S, ETB S/S AND OTHER CERTAIN LOCATIONS IN TECHNICAL AREA AT AF STN SULUR
2026_MES_772639_1
8887/E8
Open Tender
Miscellaneous Works
Item Rate
300 days
GE AF SULUR
PLEASE REF TO TENDER DOCUMENT
7 documents required · 7 mandatory
₹500
GE AF SULUR
₹90,000
22 Sept 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
6 Jul 2026
30 Jun 2026
18 Jun 2026 - 24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to transformer after disconnecting incoming HT connection and out going LT cable connection, draining out the transformer oil and keep in safe custody for reuse, disconnecting the breather assembly, temperature gauge, taking out the top cover of transformer 630 KVA, outdoor type, 11KV/ 433Volt, step down, disconnecting LT/ HT winding connections from LT/ HT Bushing and carefully taking out LT/ HT Bushing insulator and HT/ LT Brass spindle, taking out gaskets of LT/ HT Bushings and transformer top cover. Refixing exisiting LT/ HT Brass spindle with Bushing insulators after replacing Gaskets, view glass of conservator tank, refixing all cable connections, top cover with new gasket, breather/ temp gauge, refilling transformer oil, complete all as specified and as directed by Engineer-in-Charge | 1 | EACH JOB | - | - |
| 1.02 | (iv) Penalty of Rs 5000.00 per Job shall be applicable to the contractor, if the complaint is not attended immediately. Note that this penalty is exclusively other then the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract and shall be enforce above as and when delay in individual job is noticed and no claim whatsoever on this account shall be entertained by the Deptt. | - | - | - | - |
| 1.03 | (v) In case the nature of job is such that the work cannot be completed within a period of 6 hrs then the same shall be brought to the notice of the GE/Engr-in-Charge and the period for the completion of the complaint shall be decided by the GE/EIC and the same complaint shall be completed with in the period decided by the GE/EIC.The penalty of Rs 5000/ per Job shall also be applicable to the contractor for non-completion of complaint with in stipulated time decided by the GE/EIC. | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
COMMON_PAGES_8887.pdf
Tender Documents • 0.56 MB
PS_8887.pdf
Additional Documents • 0.54 MB
BOQ_865175.xls
BOQ • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .