| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | ₹4.4 L | L1 | Accepted-Finance Lowest Estimate rate Quoted |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance Highest Estimate rate Quoted |
| Sl No | Description | Qty | Unit | DHAKSHINAMOORTHY L1 | M.RAMAKRISHNAN L2 |
|---|---|---|---|---|---|
| 1.00Renovation of Panchayat Office Building at Kongudi in Kongudi Panchayat | |||||
| 2.00 | Dismantling the One Course of Pressed Tile Roof finish in cement mortar including all labour charges etc.complete | 130.34 | Sqm | 27 ₹3,519.18 | 28 ₹3,649.52 |
| 3.00 | Chipping of concrete and roughening the surface including cost and conveyance of materials to work site and all labour charges etc.complete. | 42.22 | Sqm | 43 ₹1,815.46 | 45 ₹1,899.90 |
| 4.00 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete | 49.15 | Sqm | 1,069.5 ₹52,565.93 | 1,070 ₹52,590.50 |
| 5.00 | Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.(New Tiles - 45%) | 108.56 | Sqm | 1,163 ₹1.3 L | 1,165 ₹1.3 L |
| 6.00 | Ceilling Plastering with cement mortor 1:3 mix to 10 mm thick including cost and conveyance of materials to work site and all labour charges etc.complete. | 8.01 | Sqm | 328.7 ₹2,632.89 | 330 ₹2,643.30 |
| 7.00 | Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of materials to work site and all labour charges etc.complete. | 124.27 | Sqm | 287.5 ₹35,727.63 | 290 ₹36,038.30 |
| 9.00 | White washing two coats using shell lime including cost and conveyance ofof all materials to work site and all labour charges etc. | 85.46 | Sqm | 39 ₹3,332.94 | 40 ₹3,418.40 |
| 10.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 218.89 | Sqm | 150.4 ₹32,921.06 | 155 ₹33,927.95 |
| 11.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer | 267.57 | Sqm | 267.4 ₹71,548.22 | 268 ₹71,708.76 |
Tender Value
₹4.8 L
EMD Value
₹4,850
Closing Date
6 Mar 2026, 3:00 pmClosed
Block Developement Officer(BP)
Panchayat Union Office,Aranthangi
Renovation of Panchayat Office Building at Kongudi in Kongudi Panchayat
2026_RDTN_669969_1
331/2026/A3 PUGF WORK 07
Open Tender
Civil Works - Others
180 days
Aranthangi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,850
26 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Renovation of Panchayat Office Building at Kongudi in Kongudi Panchayat
Dismantling the One Course of Pressed Tile Roof finish in cement mortar including all labour charges etc.complete
Chipping of concrete and roughening the surface including cost and conveyance of materials to work site and all labour charges etc.complete.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.(New Tiles - 45%)
Ceilling Plastering with cement mortor 1:3 mix to 10 mm thick including cost and conveyance of materials to work site and all labour charges etc.complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of materials to work site and all labour charges etc.complete.
White washing two coats using shell lime including cost and conveyance ofof all materials to work site and all labour charges etc.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Painting two coats over old iron work with ready mixxed paint of approved colour and quality including cost and conveyance of all materials towork site and all labour charges etc. complete
CONSTRUCTION OF RAMP
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Filling with M.sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges etc complete
Brick work in cm 1:5 including cost of bricks of size 8 3/4 x 4 1/4 x 2 3/4 including cost and conveyance of all materials of all materials to site and labour charges etc.
Plastering with cement mortor 1:5 mix 12mm thickness including cost of conveyance of all materials to work site and all labour charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
Arg_Document7.pdf
Tender Documents • 0.30 MB
BOQ_805116.xls
BOQ • 1.51 MB