Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance BHAGWATI NAGAR JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.8 L+₹1,900 (1.04%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.9 L+₹5,100 (2.80%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
18 Oct 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Repairs to 250 KVA voltage stabilizer along with other allied allied works at LIS Nariana.
2022_IFC_191710_1
MID/AN/100
Open Tender
Electrical and Maintenance Works
Item Wise
7 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
22 Oct 2022
10 Oct 2022
19 Oct 2022
10 Oct 2022
18 Oct 2022
12 Oct 2022
11 Oct 2022
Repairs to 250 KVA voltage stabilizer installed at LIS Nariana. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables) . Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the damaged /burnt coils ( 3 nos.) and shifting the damaged/burnt coils to workshop by using mechanical transport and head load. Thereafter dismantling of the core assembly and extraction of the burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of two no. coils by using new copper wire of the superior quality and shifting the coils back to site . Replacement of the rotor assembly (1 nos.) by way of p/f of new components, replacing all the damaged /burnt components. The job includes P/F of 1 No. volt meter (Output Meter), Meter phase indicator, phase indicator lamps. Boiling of the T.oil in stabilizer by draining it out of the tank. Heating with heater coils to make it completely moisture free, filling it back after complete cleaning and drying of tank. Providing filling of 120 litre t.oil to make up for the deficit. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts by using specified tools and tackles .Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools / tackles required at site. .
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .