Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | ₹12.9 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹13.1 LRejected-AOC | ₹13.1 L | L2 | Rejected-AOC Qualified |
| Sl No | Description | Qty | Unit | SST AND CO L1 | V NARAYANAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work:Providing Paver Block arrangement at Middle Street Tholappanpannai in srivaikundam panchayat union Thoothukudi District Under the scheme of MLA CDS 2025-26 (332m) | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B | 9.18 | cum | 125 ₹1,147.50 | 126 ₹1,156.68 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications | 6.12 | cum | 5,400 ₹33,048 | 5,400 ₹33,048 |
| 4.00 | Centering sides and soffits for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, compactiong, watering wherever necessary and laid in layers of not more than 15cm thick., etc., complete | 167.83 | SQM | 360 ₹60,418.80 | 360 ₹60,418.80 |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for all PCC works including cost and conveyance of all materials and all labour charges etc., complete complying with standard specifications and as directed. | 16.41 | cum | 6,120 ₹1.0 L | 6,210 ₹1.0 L |
| 6.00 | Supply and fabrication of steel including cost and conveyance of steel and labour charges for cutting, bending and placing in position etc, complete | 0.06 | MT | 91,800 ₹5,508 | 91,800 ₹5,508 |
| 7.00 | RCC 1:1.5:3 mix, using 20 mm, ISS HBG metal including cost and conveyance of materials and labour charges for laying, compaction, curing etc, complete. | 0.57 | cum | 6,120 ₹3,488.40 | 6,210 ₹3,539.70 |
| 8.00 | Collection and supply of 6mm metal from approved quarry including cost and conveyance and all labour charges | 103.08 | cum | 918 ₹94,627.44 | 918 ₹94,627.44 |
| 9.00 | Flooring with Paver block with Interlocking precast cc blocks of 80 mm thickness as per standard specification | 1,030.8 | SQM | 774 ₹8.0 L | 783 ₹8.1 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,97,371 ₹2.0 L | 1,99,318 ₹2.0 L |
Tender Value
₹13.2 L
EMD Value
₹13,200
Closing Date
29 Sept 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(BP)
BLOCK DEVELOPMENT OFFICER (BP) SRIVAIKUNDAM Panchayat Union Office,Srivaikundam Block,Thoothukudi District
Providing Paver Block arrangement at Middle Street Tholappanpannai in srivaikundam panchayat union Thoothukudi District Under the scheme of MLA CDS 2025-26 332 m
2025_RDTN_606471_1
BDO(BP)Srivai Lr.No. 2/1778/2025- Dt18.09.2025
Open Tender
Civil Works
150 days
srivaikundam block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹13,200
23 Feb 2026
19 Sept 2025
29 Sept 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_724899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid