Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.3 L+₹1.7 L (65.2%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.9 L+₹2.3 L (88.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹5.3 L+₹2.7 L (103.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹7.0 L+₹4.4 L (168.9%)Admitted-Finance CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HYDROCON ENGINEERS L6 | Raj Engineering Co. L1 | Devraj Enterprises L5 | MK ENGG.CO. L2 | paramount systems L3 | V.K. ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Providing & Fixing of Non return valve and other allied work at Surajmal Vihar BPS under AE (E&M)-II with following works: - All the required works, materials, arrangements, tools & tackles, workmanship, safety equipment’s as per NHRC\NGT\ DPCC etc guidelines and as per site requirement, remodeling all the damages up to standard if occurred any complete in all respect as per requirement satisfactorily job engineer- in - charge. | 1 | Job | 35,000 ₹41,300 | 5,500 ₹6,490 Lowest | 76,000 ₹89,680 | 15,000 ₹17,700 | 15,000 ₹17,700 | 7,500 ₹8,850 |
| 1.02 | Dismantling the old non return valve by cutting the old/rusted nut bolt by the gas cutter and remove the non-return valve at site which are not working at site by required tools and tackles etc as per required the site. | 1 | Job | 12,500 ₹14,750 | 9,500 ₹11,210 Lowest | 65,000 ₹76,700 | 25,000 ₹29,500 | 15,000 ₹17,700 | 20,000 ₹23,600 |
| 1.03 | Providing the Non return Valve 500 mm dia. P.N-1.6 IS 5312 Part 1Make: Kirloskar/Upadhayay | 1 | Nos | 5,08,000 ₹5,99,440 | 1,87,000 ₹2,20,660 Lowest | 3,05,000 ₹3,59,900 | 2,50,000 ₹2,95,000 | 3,40,000 ₹4,01,200 | 3,20,000 ₹3,77,600 |
| 1.04 | Fixing charges for above material at site with agreement by gas cutter, welding machine, electric city, safety equipment and fixing charges at site as per requirement. | 1 | Job | 25,000 ₹29,500 | 9,500 ₹11,210 Lowest | 1,20,000 ₹1,41,600 | 50,000 ₹59,000 | 15,000 ₹17,700 | 71,000 ₹83,780 |
| 1.05 | Painting of the complete structure with brush with one coat of primer & two coat of enamel paint i/c petty items. | 1 | Job | 11,000 ₹12,980 | 4,500 ₹5,310 Lowest | 14,500 ₹17,110 | 10,000 ₹11,800 | 15,000 ₹17,700 | 25,000 ₹29,500 |
| 1.06 | Testing and commissioning the complete after completion in all respect on no load / full load. | 1 | Job | 10,000 ₹11,800 | 4,500 ₹5,310 Lowest | 12,500 ₹14,750 | 14,350 ₹16,933 | 15,000 ₹17,700 | 5,000 ₹5,900 |
Tender Value
Refer Docs
EMD Value
₹14,100
Closing Date
7 Nov 2025, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Providing AND Fixing of Non return valve and other allied work Surajmal Vihar BPS under AE (EM)-II
2025_DJB_280614_32
NIT No-09 EE (EM) M-1/ (25-26)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹14,100
Yes
24 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_370572.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .