Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Fee/PreQual/Technical/Finance | -31.20% | ₹13.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14 L+₹24,000 (1.74%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹14 L+₹24,000 (1.74%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.2 L+₹42,000 (3.05%)Admitted-Fee/PreQual/Technical/Finance | -29.10% | ₹14.2 L+₹42,000 (3.05%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.9 L+₹1.1 L (8.17%)Admitted-Fee/PreQual/Technical/Finance | -25.58% | ₹14.9 L+₹1.1 L (8.17%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹15.8 L+₹2.0 L (14.7%)Admitted-Fee/PreQual/Technical/Finance | -21.10% | ₹15.8 L+₹2.0 L (14.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20 L
EMD Value
₹60,000
Closing Date
23 Jul 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRACTION OF CHAWKI REARING CENTRE (CRC) AT CHAGALPORA NURSERY D.H PORA
2026_RDPR_314564_1
e- NIT No. 23 OF REWK/HADP OF 2026-27 Dated 04-07-2026
Open Tender
Civil Works
Percentage
90 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
EX ENGINEER REW KULGAM
₹60,000
29 Jul 2026
4 Jul 2026
25 Jul 2026
4 Jul 2026
23 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 32.17 | cum | - | - |
| 2 | P/L stone solling hand packed including all leads.complete job. | 26.55 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.44 | cum | 1 | ₹7.43 |
| 4 | Providing and laying in position reinforced cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 14.31 | cum | - | - |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 4.21 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 25.72 | cum | - | - |
| 7 | Steel for RCC work including cutting, bending,binding and placing in position all complete. | 1,475.1 | kgs | 1 | ₹1,473.62 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns. | 110.16 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 37.37 | sqm | 1 | ₹37.33 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Suspended floors etc. | 15.23 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1018531.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .