Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.5 LAdmitted-Finance | +15.00% | ₹11.5 L | L1 | Admitted-Finance |
| 2 | L2₹12.0 L+₹49,998.41 (4.35%)Admitted-Finance | +20.00% | ₹12.0 L+₹49,998.41 (4.35%) | L2 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
27 Jul 2026, 6:00 pmClosed
COMMISSIONER
MUNICIPAL COUNCIL SIROHI
Construction Of Nallah Near Sanjivani Hospital at National Highway, Sirohi
2026_DLB_576742_1
5610
Open Tender
Civil Works
Percentage
60 days
MUNICIPAL COUNCIL SIROHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDRISL, COMMISSIONER
₹20,000
Yes
17 Aug 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
27 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses | 7.5 | Cum | 445 | ₹3,337.5 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Prestressed /Reinforced cement concrete with separating, cleaning, straightening and cutting of bars | 22.5 | Cum | 1,692 | ₹38,070 |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 meter as per MoRT&H specification clause 301. In all type of soil. | 56.25 | Cum | 235.5 | ₹13,246.88 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking earth 2.0km | 86.25 | Cum | 185.54 | ₹16,002.82 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 15 | Cum | 4,575 | ₹68,625 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 53.1 | Cum | 5,910 | ₹3,13,821 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 75 | Cum | 236.5 | ₹17,737.5 |
| 8 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | 90 | Sqm | 227 | ₹20,430 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-30 Grade Concrete | 22.5 | Cum | 7,770 | ₹1,74,825 |
| 10 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars | 1,600 | Kg | 83.3 | ₹1,33,280 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.00 MB
Tendernotice_1.pdf
PDF • 1.87 MB
BOQ_1025245.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .