| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC R S MAIN ROAD MANALI POST THIRUTHURAIPOONDI TALUK TIRUVARUR DISTRICT 610210 | 610210 | ₹4.0 L | L1 | Accepted-AOC Lowest Tender Rate quated |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | A.Kadarkarairaj | A.SIVAKUMAR |
|---|---|---|---|---|---|
| 1.00Additional Work for School Building | |||||
| 1.01 | Dismantling the Plain cement Concrete | 8.1 | Cum | 4,214.43 ₹4,973.03 | 4,213.62 ₹4,972.07 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 8.1 | Cum | 44,752.5 ₹52,807.95 | 44,752.1 ₹52,807.48 |
| 1.03 | Paving the floor with best quality Stain free Nano Polish Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. | 80.93 | Sqm | 1,23,604.39 ₹1.5 L | 1,23,596.3 ₹1.5 L |
| 1.04 | Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete. | 93.72 | Sqm | 26,944.5 ₹31,794.51 | 26,925.76 ₹31,772.40 |
| 1.05 | Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete | 24.48 | Sqm | 3,769.92 ₹4,448.51 | 3,762.58 ₹4,439.84 |
| 1.06 | Towards to the cost of Purlin Channel including all cost and labour charges etc., complete. | 125 | Rm. | 21,937.5 ₹25,886.25 | 21,875 ₹25,812.50 |
| 1.07Teachers Cubboard | |||||
| 1.08 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 0.28 | Cum | 1,755.32 ₹2,071.28 | 1,755.31 ₹2,071.27 |
| 1.09 | Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete. | 5.26 | Sqm | 1,512.25 ₹1,784.46 | 1,511.2 ₹1,783.22 |
Tender Value
₹4.0 L
EMD Value
₹4,040
Closing Date
10 Mar 2026, 3:00 pmClosed
BDO (BP)
BDO Office
Providing Flooring Tiles and Electrification Arrangement in PU Middle School at Chindapalli Village and Panchayat
2026_RDTN_671659_1
A2/1762/2025
Open Tender
Civil Works
Sattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,040
Yes
16 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
Additional Work for School Building
Dismantling the Plain cement Concrete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Paving the floor with best quality Stain free Nano Polish Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards to the cost of Purlin Channel including all cost and labour charges etc., complete.
Teachers Cubboard
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Supply and fixing with Cudappah slab in 20-30mm thick for cub-board
Distembering two coats Oil Bound Distember over priming coat inculding cost and conveyance of all materials to site and all labour charges for preparing the surface, scrapping, attaining smooth finish etc., complete
Students Cubboard
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Supply and fixing with Cudappah slab in 20-30mm thick for cub-board
Distembering two coats Oil Bound Distember over priming coat inculding cost and conveyance of all materials to site and all labour charges for preparing the surface, scrapping, attaining smooth finish etc., complete
Cheppal Rack Cubboard
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Supply and fixing with Cudappah slab in 20-30mm thick for cub-board
Distembering two coats Oil Bound Distember over priming coat inculding cost and conveyance of all materials to site and all labour charges for preparing the surface, scrapping, attaining smooth finish etc., complete
Rainwater Harvesting Structure
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and Fixing of 110mm PVC Pipe including cost and conveyance of all materials to work site and labour charges etc., complete.
Supply and Fixing of 110mm PVC Bend including cost and conveyance of all materials to work site and labour charges etc., complete.
Supply and Fixing of 0.60M Dia RCC Ring 2 Nos. & Salb 1 No. including cost and conveyance of all materials to work site and labour charges etc., complete.
Electrification arrangement
Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch and making good of the concealed portion with suitable colour for PVC concealed fan Point (for electronic regulator) (5 points per coil) SD 25
Supply and fixing of Single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting. SD 88
Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mm x 100mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A 3 pin non inter locking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point (SD 38)
Towards to the cost of New Steel Window Size of 0.90 x 1.20M including all cost and labour charges etc., complete.
Labour charges for fixing Windows along with frames in position and right to plumb including other incidental charges etc., complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807153.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_807153.xls
BOQ • 0.40 MB
eBidChindapalli.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid