| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically responsive as per technical evaluation report and bidding document, subject to further scrutiny |
| 2 | Accepted-Technical | Accepted-Technical Technically responsive as per technical evaluation report and bidding document, subject to further scrutiny |
| 3 | Accepted-Technical | Accepted-Technical Technically responsive as per technical evaluation report and bidding document, subject to further scrutiny |
| 4 | Accepted-Technical | Accepted-Technical Technically responsive as per technical evaluation report and bidding document, subject to further scrutiny |
| 5 | Accepted-Technical | Accepted-Technical Technically responsive as per technical evaluation report and bidding document, subject to further scrutiny |
Tender Value
₹21.3 L
EMD Value
₹42,620
Closing Date
4 May 2026, 2:00 pmClosed
Director
NEIGRIHMS, Mawdiangdiang
Construction of Pump Operators shed etc
2026_NES_905303_1
CVENGG-ESTI/4/2025-Engg (C) A
Open Tender
Civil Works
Works
180 days
NEIGRIHMS, Mawdiangdiang
EMD, Affidavit, Registration, Manual, etc and all other related documents as per tender document
2 documents required · 2 mandatory
₹0
₹42,620
28 Sept 2026
13 Apr 2026
5 May 2026
14 Apr 2026
4 May 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | Sqm | - | - |
| 1.02 | Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | - | Cum | - | - |
| 1.03 | Earthwork in excavation by manual means upto a depth of 2m below the existing ground level for foundation trenches of foundations, footings of column/ walls, retaining walls, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils.
All kinds of soil (ordinary soil/ hard soil/dense soil)
In ordinary rock (soft rock/ medium rock/ hard shale)
b) In ordinary rock (soft rock/ medium rock/ hard shale) | 100.82 | Cum | - | - |
| 1.04 | Providing soling with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.
b) Stone soling i) 100mm | 107.85 | Sqm | - | - |
| 1.05 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plinth level with:
a) Cement mortar 1:6 (1 cement:6 coarse sand) | 70.17 | Cum | - | - |
| 1.06 | Plain cement concrete works in foundation bed for footing steps, walls, brick works etc below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).
b) 1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) | 10.27 | Cum | - | - |
| - | Supplying, fitting and fixing in position reinforcement bars upto 1stfloor level, conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (Rates inclusive of all wastage, lappage, hooks, chairs, anchorage etc. and no measurement for the same is required)
b) High Yield Strength Deformed bars or Tor Bars | 16.07 | Qntl | - | - |
| - | SHUTTERING/ FORMWORK
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete and as directed by Engineer in charge.
Columns, Pillars, Piers, Abutments, Posts and Struts (using steel) | 109.86 | Sqm | - | - |
| - | SHUTTERING/ FORMWORK
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete and as directed by Engineer in charge
Lintels, beams, plinth beams, girders, bressumers and cantilevers (using steel) | 20.25 | Sqm | - | - |
| - | SHUTTERING/ FORMWORK
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete and as directed by Engineer in charge Slabs, roofs, landings, balconies and access platform, shelves (using steel) | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_951563.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .