Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-Finance | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹40.5 L+₹65,000 (1.63%)Accepted-Finance PLOT NO 30 KRISHNA COTTAGE SUNDARAM NAGAR MUTHAIPURAM TUTICORIN 628 005 | TUTICORIN | TUTICORIN | TAMIL NADU | 628005 | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹49.1 L
EMD Value
₹49,000
Closing Date
16 Mar 2023, 2:00 pmClosed
Superintending Engineer/Mechanical-I
O/o SE/MI/TTPS
ICHP- Removal, cleaning and disposal of the spilled and accumulated coal in Conveyor-25A and B area, conveyor equipments, inspection and pulley bearings periodical greasing, assisting for conveyor cut and joint, pulley lagging and pulley etc.,
2023_EB_291370_1
SE/MI/TTPS/15/2023-2024
Open Tender
Miscellaneous Works
Works
366 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹49,000
23 Mar 2023
28 Feb 2023
17 Mar 2023
28 Feb 2023
16 Mar 2023
28 Feb 2023
Removal cleaning and disposal of spillage coal etc., in Conveyor-25A/B
Charges for removal , cleaning and disposal of spillage and accumulated coal daily in the conveyor 25 A/B areas, Including cost of consumables. T&P s hire charges etc., complete
Charges for Monitoring and renewal of the running equipments of conveyor 25A/B. And its auxillary equipments, floors simple maintenance works, (Example: damaged idler,idler frame, replacement, damaged skirt rubber, return scrapper replacement , Oil changing/ Oil top up/ Oil checking, minor chock removal etc) to keep the equipments in running condition and other related works in shift duties etc., complete.
Charges for assisting works for belt joint in conveyor 25A/B including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete.
Charges for assisting works for pulley lagging works in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trial operation including T&P hire charges cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley /bend pulley /take up pulley in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley in conveyors 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after trial operation including T&P hire charges and cost of consumables etc., complete.
Charges for overhauling and inspection of gear coupling in conveyor-25A/B & replacement of necessary including arresting the conveyor belt lifting the counter weight dismantling the gear coupling removal of old grease, cleaning the gear teethes, arranged for inspection, packing the new grease and normalizing the system after pulley lagging, trial operation including T&P hire charges, cost of consumables etc., complete.
Ramakrishna Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .