| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.6 LRejected-Finance | ₹4.6 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | N VENKATESAN L2 | M V THIRUMAL L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 64.64 | m3 | 265 ₹17,129.60 | 263.78 ₹17,050.74 |
| 2.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc, | 6.46 | m3 | 5,360 ₹34,625.60 | 5,359.8 ₹34,624.31 |
| 3.00 | Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 29.06 | m3 | 6,120 ₹1.8 L | 6,115 ₹1.8 L |
| 4.00 | Supply and fabrication of steel for RCC items including all cost and conveyance of steel, labour charges for cutting, binding, tying to shape, etc, | 0.52 | MT | 91,960 ₹47,819.20 | 91,951 ₹47,814.52 |
| 5.00 | CC 1:2:4 Mix using 20mm metal including coast and conveyance of all materials to site | 1.34 | m3 | 6,670 ₹8,937.80 | 6,665.84 ₹8,932.23 |
| 6.00 | Reinforced Cement Concrete 1:1.2:3mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete | 3.9 | m3 | 9,110 ₹35,529 | 9,106.3 ₹35,514.57 |
| 7.00 | Toward Centering Charges including cost and conveyance of all materials to site and all | 72.76 | m3 | 550 ₹40,018 | 547.5 ₹39,836.10 |
| 8.00 | Toward Centering Charges including cost and conveyance of all materials to site and all
Bed Block, Dirtwall and Deck Slab | 23.8 | m2 | 1,200 ₹28,560 | 1,095 ₹26,061 |
| 9.00 | GST 18% | 1 | No | 70,283.95 ₹70,283.95 | 69,756.37 ₹69,756.37 |
| 10.00 | LWF 1% | 1 | No | 3,904.66 ₹3,904.66 | 3,875.35 ₹3,875.35 |
Tender Value
₹4.6 L
EMD Value
₹4,630
Closing Date
26 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
Construction RCC Slab Culvert at Arundhathiyar Street Adi Dravidar Kudiyiruppu in Korukkai
2025_RDTN_632258_1
A19/3721/2025 - Korukkai Culvert
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,630
8 Jan 2026
15 Dec 2025
26 Dec 2025
15 Dec 2025
26 Dec 2025
15 Dec 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supply and fabrication of steel for RCC items including all cost and conveyance of steel, labour charges for cutting, binding, tying to shape, etc,
CC 1:2:4 Mix using 20mm metal including coast and conveyance of all materials to site
Reinforced Cement Concrete 1:1.2:3mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
Toward Centering Charges including cost and conveyance of all materials to site and all
Toward Centering Charges including cost and conveyance of all materials to site and all Bed Block, Dirtwall and Deck Slab
N VENKATESAN (BID ID -1545841)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_756440.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid