Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.3 CrAccepted-AOC BEHIND WATER WORKS ST NO 4 JAIN NAGRI ROAD ABOHAR | ₹6.3 Cr Quoted ₹6.6 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹7.1 Cr+₹48.9 L (7.44%)Rejected-AOC | ₹7.1 Cr+₹48.9 L (7.44%) | L-2 | Rejected-AOC L-2 |
| Sl No | Description | Qty | Unit | M/s Khara Contractors L1 | GURINDER PAL SINGH CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Filling of Stone or Spall into Crates and Hand Packing i/c Supply of Boulder Stone with weight 18 Kg. - 40 kg. and Boulder Stone with weight upto 18 Kg. not exceeding 10% of total quantity of Boulder Stone i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to stackyard, stacking and Re-carriage/ Rehandeling of Boulder Stone from stackyard to site of work etc. Complete in all respect. | 6,784.61 | Cum | 2,248 ₹4,54,53,211.2 Lowest | 2,458 ₹4,96,99,285.2 |
| 2.00 | Weaving of Wire Netting for Wire Crates i/c binding sides & partitions to make Crates of 15 cm x 15 cm or 25 cm x 7.5 cm mesh i/c supply & carriage of M.S. Annealed Wire. | 1,40,996.93 | Sqm | 210 ₹1,83,54,714 Lowest | 216 ₹1,88,79,134.4 |
| 3.00 | Tipping of Wire Crates including equipment | 15,222.23 | Cum | 133 ₹10,78,352.03 Lowest | 143 ₹11,59,431.13 |
| 4.00 | Excavation of soil using Excavator and hydraulic tractor trolly I/C cutting and loading in trolley and transporting to the embankment all locations including all lifts and leads, excluding royalty with an avg. lead 3 km | 25,547.12 | Cum | 35 ₹30,705.5 Lowest | 37 ₹32,460.1 |
| 5.00 | Supply/Filling Geo bags (pet 300gsm white soft size 1.0 m x 0.7 m ) with sand or earth sewing and laying in position within 30 mtr in dry including cost of Geo Bags. | 25,547.12 | Cum | 1,840 ₹7,81,080 Lowest | 1,920 ₹8,15,040 |
| 6.00 | Supply and laying first layer of graded filter with graded gravel 25 mm to 75 mm including loading, unloading carriage from approved quarry. Complete in all respect, as per drawing, design, spesifications & the instruction of Engineer incharge | 39.85 | Cum | - | - |
| 7.00 | Basic Rate of ordinary earth/clay taken from private land including compensation but excluding royalty | 25,547.12 | Cum | - | - |
| 8.00 | Any Other | 1 | CSR | - | - |
Tender Value
Refer Docs
EMD Value
₹11.8 L
Closing Date
16 Apr 2026, 10:00 amClosed
XEN Ferozepur Drainage-Cum-Mining Division
XEN Ferozepur Drainage-Cum-Mining Division
Construction Of Flood Mitigation Structure over the left edge of river Sutlej opposite RD 13000 to 14200 of advance bundh RD 0-20200 at village Wara Kaliroun Tehsil Zira, District Ferozepur.
2026_WR_165115_7
TN1349
Open Tender
Civil Works
Item Rate
60 days
XEN Ferozepur Drainage-Cum-Mining Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹11.8 L
12 Jun 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling of Stone or Spall into Crates and Hand Packing i/c Supply of Boulder Stone with weight 18 Kg. - 40 kg. and Boulder Stone with weight upto 18 Kg. not exceeding 10% of total quantity of Boulder Stone i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to stackyard, stacking and Re-carriage/ Rehandeling of Boulder Stone from stackyard to site of work etc. Complete in all respect. | - | Cum | - | - |
| 2 | Weaving of Wire Netting for Wire Crates i/c binding sides & partitions to make Crates of 15 cm x 15 cm or 25 cm x 7.5 cm mesh i/c supply & carriage of M.S. Annealed Wire. | - | Sqm | - | - |
| 3 | Tipping of Wire Crates including equipment | - | Cum | - | - |
| 4 | Excavation of soil using Excavator and hydraulic tractor trolly I/C cutting and loading in trolley and transporting to the embankment all locations including all lifts and leads, excluding royalty with an avg. lead 3 km | - | Cum | - | - |
| 5 | Supply/Filling Geo bags (pet 300gsm white soft size 1.0 m x 0.7 m ) with sand or earth sewing and laying in position within 30 mtr in dry including cost of Geo Bags. | - | Cum | - | - |
| 6 | Supply and laying first layer of graded filter with graded gravel 25 mm to 75 mm including loading, unloading carriage from approved quarry. Complete in all respect, as per drawing, design, spesifications & the instruction of Engineer incharge | - | Cum | - | - |
| 7 | Basic Rate of ordinary earth/clay taken from private land including compensation but excluding royalty | - | Cum | - | - |
| 8 | Any Other | - | CSR | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
SBD18NoSDMFWorks.pdf
Tender Documents • 1.68 MB
BOQ_334878.xls
BOQ • 0.23 MB
Corrigendum6.pdf
PDF • 1.62 MB
BOQ7.rar
PDF • 1.70 MB
Corrigendum1.pdf
PDF • 0.74 MB
Corrigendum22worksdmf.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .