Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
Closing Date
15 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Right River Works Division
Right River Works Division Regal Lane Lal chowk
onstruction of R wall cement concrete from the Gh. Muhammad Pampori upro Fayaz Ahmad Zaroo via Gh Muhamamd Pahalwan at Wantpora Makepora Kawadara (INVOLVES HEAD LOAD)
2021_HAUDD_146365_10
NIET 09 of 2021-22 RRWD SMC
Open Tender
Civil Works
Item Wise
35 days
at Wantpora Makepora Kawadara (INVOLVES HEAD LOAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Yes
FA Chief Accounts Officer SMC 0216010200000007
Exempted
16 Nov 2021
3 Nov 2021
16 Nov 2021
4 Nov 2021
15 Nov 2021
4 Nov 2021
90 days
Amount
Earth work in excavation by manual means in trenches for foundations drains , pipes cables etc (Not exceeding 1.5 Mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
Providing and laying of stone soling hand packed including plum etc including loading and unloading complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto Plinth level 1:4:8 (1 Cement :4 Coarse sand : 8 graded stone aggregate 40mm nominal size) complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
Form work: Centring and shuttering including strutting, Propping etc and removal of form work for Retaining walls, retrun walls (any thickness) including attached pilasters, butresses, plinth and string course fillets kerbs and steps etc complete job as directed at site including all carriages mechanical/ manual including cost all sorts of head load (If any)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto Plinth (Plum Concrete with 30% ) level 1:3:6 (1 Cement :3 Coarse sand : 6 graded stone aggregate 20mm nominal size) complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto Plinth level 1:2:4 (1 Cement :2 Coarse sand : 4 graded stone aggregate 20mm nominal size) complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
Provision for sign board and taking of photographs before during and after execution of work complete job as directed at site including all carriages mechanical/ manual including cost of all sorts of head load
M/S NAZIR AHMAD BHAT
stage.html
html • 0.02 MB
finance_315480.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .