Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Accepted-Finance ok | |
| 2 | L2₹6.7 L+₹2.1 L (45.4%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical | - | Rejected-Technical Non submission of EMD /FDR | |
| 4 | Rejected-Technical PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | - | Rejected-Technical Non submission of EMD /FDR |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
1 Feb 2024, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Replacement of metering and protection CTs of 3.3KV for HT panels and allied works at North pump house clear water HP I
2024_DJB_252605_9
NIT 17
Open Tender
Miscellaneous Works
Item Rate
60 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹14,000
3 Feb 2024
25 Jan 2024
1 Feb 2024
25 Jan 2024
1 Feb 2024
25 Jan 2024
Disconnection of HT supply from main incomer and proper discharging the OCB with all tool and tackles as required for HT works with all safety precautions
dismantling of old defective 3.6 KV CTs and PTs from the feeder panels of north pump house after bypassing the all required cable connections/ To avoid the major shutdown and connections of incoming & out going supplies as per require workable condition & as per instruction of engineer in charge without effecting the pumping from the plant.
Cleaning of complete CTs and PTs chamber, bushings, outgoing/indoor termination cable joint, insulators and connecting bus bar with the help of CRC and as required for the work with all tools and tackles as required for HT
Supply of HT 3.6 KV. resin cast , double core ,double ratio, Current transformer of ratio 100/5A class 1.0 for metering & class 5P10 for protection with 15VA burden or as per sample of existing PT for suitable to install in existing space without any shutdown in existing panel
Supply of PT with 15VA burden or as per sample of existing PT for suitable to install in existing space at incomers of HT panels without any shutdown in existing panel
Supply of various miscellaneous items such as Fuse links, Mounting structure ,tag link, Connecting tag wire, Offset Tags Double Slot, Moulded Fuse Holder ,PVC tape, HT Tape CT mounting links for fixing and making connection of the above said work
Supply of Motor protection circuit fuses 3.6 of KV High voltage fuses of rating 100 ampere having the breaking capacity of 25 Kilo ampere burden or as per sample of existing Fuse for suitable to install in existing space without any major shutdown and modification in existing panel 3 Nos. In one
Fixing of new CT in the feeder panels in North pump house in all respect by modification & making suitable copper bus bars, space for replacing old CTs/PTs and old control wiring, providing new control wiring with proper ferruling making all electrical connection with PVC tape according to Phase sequence,
Fixing of new PT in the incomer panels in North pump house in all respect by modification & making suitable copper bus bars, space for replacing old PTs and old control wiring, providing new control wiring with proper ferruling making all electrical connection with PVC tape according to Phase sequence,
Fixing of new Motor protection circuit fuses in the feeder panels in North pump house in all respect by modification & making suitable copper bus bars, space for replacing old fuses and old control wiring, providing new control wiring with proper ferruling making all electrical connection with PVC tape according to Phase sequence,
Reassembling of complete panel link and making connection for all CT PT fuses and tightening of all required links and thimbles and closing the panel in all respects.
Testing & Commissioning of the feeders with the help of Hi-pot machine and taking all results on No load & full load., Continuity and earthing, Polarity of current Transformer 'Breaker mechanism and alignment, Meggering of all equipment's for phase to phase, neutral to body, neutral to earth and phase to earth. All functional tests. Checking for all tightness of nuts and bolts, interlocking tests, Alignments of doors etc.
GOGIA BROTHERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .