Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Accepted for AOC |
| 2 | L2₹1.4 Cr+₹19,859 (0.14%)Rejected-AOC | ₹1.4 Cr+₹19,859 (0.14%) | L2 | Rejected-AOC Not lowest, L2 |
| 3 | L3₹1.4 Cr+₹70,551 (0.49%)Rejected-AOC | ₹1.4 Cr+₹70,551 (0.49%) | L3 | Rejected-AOC Not lowest, L3 |
| Sl No | Description | Qty | Unit | M/s M S BUILDERS L2 | M/s Anil Kumar Contractor L3 | AVN ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.01 | Construction of Water Resource Museum at Ropar Head Works on EPC Mode | 1 | each | 1,43,96,389 ₹1,43,96,389 | 1,44,47,081 ₹1,44,47,081 | 1,43,76,530 ₹1,43,76,530 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
28 Jul 2026, 10:00 amClosed
Executive Engineer
O/o Executive Engineer, Building and Store Division, Sector 17E, Chandigarh
Construction of Water Resources Museum at Ropar Head Works on EPC Mode
2026_WR_171828_1
NIT 03/2026-27
Open Tender
Civil Works - Others
Item Rate
180 days
Ropar Headworks
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.9 L
Chandigarh
13 Aug 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Water Resource Museum at Ropar Head Works on EPC Mode | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
DNIT.pdf
Tender Documents • 2.23 MB
BOQ_349488.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .