Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹16,382.25 (7.51%)Rejected-AOC 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | TEAM ENGINEERING AND CONSTRUCTION | KRISHNA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and lift of 2m including cost of all materials, labours, lead, lift, etc. complete. | 2.1 | M3 | 199.5 ₹235.41 Lowest | 210 ₹247.8 |
| 2.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete. | 5.2 | M2 | 5,824 ₹6,872.32 Lowest | 5,980 ₹7,056.4 |
| 3.00 | Providing PCC 1:3:6 using OP/PP cement with 20mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 7.55 | M3 | 53,605 ₹63,253.9 Lowest | 54,360 ₹64,144.8 |
| 4.00 | Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, labour, lead, lift, curing, etc., complete. | 5.95 | M3 | 41,650 ₹49,147 Lowest | 43,435 ₹51,253.3 |
| 5.00 | Plastering with CM 1:5, 12mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete. | 29.25 | M2 | 9,067.5 ₹10,699.65 Lowest | 9,945 ₹11,735.1 |
| 6.00 | Refilling with sand for filling in basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete. | 16.75 | M3 | 14,070 ₹16,602.6 Lowest | 15,075 ₹17,788.5 |
| 7.00 | Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete. | 495.8 | Kg | 49,580 ₹58,504.4 Lowest | 59,496 ₹70,205.28 |
| 8.00 | Supplying and providing new GALVALUME SHEETS of 0.47mm thick rate including cost of all materials, fixtures, bolts, rivets with all lead, lift, labour etc., complete | 30.75 | M2 | 35,977.5 ₹42,453.45 Lowest | 36,900 ₹43,542 |
| 9.00 | Painting two coats with ready mixed enamel paint for the New Steel surface with primer including cost of all materials, scaffolding charges, labours, lead, lift, curing etc., complete. | 25 | M2 | 6,250 ₹7,375 Lowest | 7,000 ₹8,260 |
| 10.00 | Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete. | 29.25 | M2 | 1,842.75 ₹2,174.45 Lowest | 2,047.5 ₹2,416.05 |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
2 Sept 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Providing Galvalume Sheet Shed for 62.5 KVA Diesel Generator Set near GLR 1 at Thermal Nagar
2025_EB_592378_1
CE SE C TTPS 213 2025 26
Open Tender
Civil Works - Others
Item Rate
60 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,200
Yes
24 Oct 2025
13 Aug 2025
3 Sept 2025
13 Aug 2025
2 Sept 2025
13 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .