Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
28 Aug 2026, 6:00 pm4d left
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repairing of the fencing of Bankola colliery magazine at Bankola under bankola area.
2026_ECL_363953_1
ECL/GM/BA/E TENDER/26-27/Civil/025 Dt 18.08.2026
Open Tender
Civil Works - Others
Percentage
30 days
Bankola Colliery
Please refer to NIT document
3 documents required · 3 mandatory
₹3,600
18 Aug 2026
18 Aug 2026
29 Aug 2026
18 Aug 2026
28 Aug 2026
18 Aug 2026
18 Aug 2026 - 22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 15,000 | Mtr | 10.45 | ₹1,56,750 |
| 2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 30 graded stone aggregate 20 mm nominal size) | 0.3 | Cum | 8,030.65 | ₹2,409.19 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 9 | Sqm | 644.7 | ₹5,802.3 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 21.2 | Kg | 95.75 | ₹2,029.9 |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 2,760 | Sqm | 10.8 | ₹29,808 |
| 6 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.22 | Cum | 1,494.4 | ₹1,823.17 |
| 7 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.22 | Cum | 1,494.9 | ₹1,823.78 |
| 8 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. | 1,694 | Kg | 22.6 | ₹38,284.4 |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_376881.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].