| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.6 LRejected-AOC | ₹12.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹12.9 LRejected-AOC | ₹12.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹12.9 LRejected-AOC | ₹12.9 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | G.K.Gunasekaran L1 | ARASU GROUPS L2 | SUNDARADEVAN S L3 | BHARATHI CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00I.CIVIL WORKS BUILDINGS | |||||||
| 2.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 6.51 | cu.m | 1,800 ₹11,718 Lowest | 2,000 ₹13,020 | 2,300 ₹14,973 | 2,000 ₹13,020 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 3.04 | cu.m | 5,500 ₹16,720 Lowest | 6,000 ₹18,240 | 6,000 ₹18,240 | 6,000 ₹18,240 |
| 4.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 6.71 | cu.m | 35 ₹234.85 Lowest | 40 ₹268.4 | 41.5 ₹278.47 | 40 ₹268.4 |
| 5.00 | Supplying and Filling of good quaity earth filling loclity available earth including leveling in layers thick | 0.23 | cu.m | 90 ₹20.7 Lowest | 100 ₹23 | 990 ₹227.7 | 100 ₹23 |
| 6.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||||
| 7.00 | Footing, Plinth Beam, etc. | 2.36 | sq.m | 495 ₹1,168.2 Lowest | 500 ₹1,180 | 516.5 ₹1,218.94 | 500 ₹1,180 |
| 8.00 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 37.98 | sq.m | 950 ₹36,081 Lowest | 1,000 ₹37,980 | 1,100 ₹41,778 | 1,000 ₹37,980 |
| 9.00Concrete | |||||||
| 10.00Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials). | |||||||
Tender Value
Refer Docs
EMD Value
₹13,565
Closing Date
16 Jun 2026, 3:00 pmClosed
Block Development Officer(B.pt),Kottur Block.
Block Development Officer(B.pt),Kottur Block
1 CONSTRUCTION OF NEW ADDITIONAL 2 CLASS ROOM BUILDING PUMPS PERUGAVAZHNTHAN IN PERUGAVAZHNTHAN PANCHAYAT IN TIRUVARUR DISTRICT Package No 1 KTR NABARD ASSISTANCE 2024 2025
2026_RDTN_679106_1
RC No 3356 2024 a2 02 06 2026 NABARD Assistance 2024 25 Kottur Block Perugavazhnthan Panchayat
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹13,565
Yes
1 Jul 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | I.CIVIL WORKS BUILDINGS | - | - | - | - |
| 2 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 1 | cu.m | - | - |
| 3 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | - | cu.m | - | - |
| 4 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | - | cu.m | - | - |
| 5 | Supplying and Filling of good quaity earth filling loclity available earth including leveling in layers thick | - | cu.m | - | - |
| 6 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | - | - | - | - |
| 7 | Footing, Plinth Beam, etc. | 1 | sq.m | - | - |
| 8 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 1 | sq.m | - | - |
| 9 | Concrete | - | - | - | - |
| 10 | Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials). | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_815899.xls
BOQ • 0.41 MB
techbide.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].