Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹117.60 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹1.2 L+₹117.60 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 L
EMD Value
₹3,540
Closing Date
11 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CO FOOTSTEPS NEAR AHLIHADEES MASJID TANJIMULLA BLOCK CHITTERGUL
2026_RDPR_314699_13
ENIT49of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,540
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
11 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of site by engaging labours. | - | No | - | - |
| 2 | E/W in excavation by manual means in trenches for foundations, drains, pipes,cables etc (not exceedin 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, i/c dressing of sides and ramming of bottoms lift upto 1.5m i/c getting out excavated earth and disposal of surplus excavated earth as directed. | 1 | Cum | - | - |
| 3 | P/L of Dry Stone solling Nallah Tightly Hand packed In Horizental on Level i/c carriage for 5 kms lead. | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 4.4.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 5 | 20% plum in concrete | - | cum | 1 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 0.2 | sqm | - | - |
| 7 | Carriage of sand/ aggregates avg lead 30 km by Mt | - | Cum | - | - |
| 8 | Carriage cement and tiles by M T.i/c loading unloading complete job. | - | trips | - | - |
| 9 | Add provision for PG/SB charges | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1019267.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .