| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC LOWEST RATE WILL BE APPROVED |
| 2 | L2₹6.3 LRejected-Finance | ₹6.3 L | L2 | Rejected-Finance LOWEST RATE WILL BE APPROVED |
| 3 | L3₹6.4 LRejected-Finance | ₹6.4 L | L3 | Rejected-Finance LOWEST RATE WILL BE APPROVED |
| 4 | L4₹6.6 LRejected-Finance | ₹6.6 L | L4 | Rejected-Finance LOWEST RATE WILL BE APPROVED |
| 5 | L5₹6.7 LRejected-Finance | ₹6.7 L | L5 | Rejected-Finance LOWEST RATE WILL BE APPROVED |
| Sl No | Description | Qty | Unit | T.MAHALINGAM L3 | K KASITHEVAR L1 | MITHRA & CO L4 | GREEN STAR CONTRACTOR L5 | LAXMI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work : CONSTRUCTION OF BUS SHELTER @ PUDHUPATTINAM VILLAGE AND PANCHAYAT. | ||||||||
| 2.00 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B. | 17.02 | m3 | 240 ₹4,084.8 | 150 ₹2,553 Lowest | 252.97 ₹4,305.55 | 255.6 ₹4,350.31 | 210 ₹3,574.2 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site and all Labours etc | 4.28 | m3 | 6,200 ₹26,536 | 5,100 ₹21,828 Lowest | 5,996.5 ₹25,665.02 | 6,059.03 ₹25,932.65 | 5,800 ₹24,824 |
| 4.00 | Supply and filling of conveyed earth by lorry in basement filling including stacking etc | 8.68 | m3 | 104 ₹902.72 | 40 ₹347.2 Lowest | 116.03 ₹1,007.14 | 117.24 ₹1,017.64 | 150 ₹1,302 |
| 5.00 | Brickwall in cement mortar 1:5 mix including cost & conveyance of all materials to site including cost and labour charges incidental charges and curing etc., complete for super structure. | 10.66 | m3 | 6,207 ₹66,166.62 | 5,500 ₹58,630 Lowest | 5,994.33 ₹63,899.56 | 6,056.84 ₹64,565.91 | 6,000 ₹63,960 |
| 6.00 | ReinforcedCement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site and all Labours etc | 14.09 | m3 | 9,510 ₹1,33,995.9 | 8,400 ₹1,18,356 Lowest | 9,591.08 ₹1,35,138.32 | 9,691.09 ₹1,36,547.46 | 9,300 ₹1,31,037 |
| 7.00 | Supplying fabricating and placing in position of steel rod for reinforcement including cost of steel, binding wire etc., complete complying with reluctant standard specifications | 1,210.83 | KG | 82 ₹99,288.06 Lowest | 85 ₹1,02,920.55 | 88.19 ₹1,06,783.1 | 89.11 ₹1,07,897.06 | 88 ₹1,06,553.04 |
| 8.00 | Towards centering and Shuttering including all required wooden Materils and Labours etc | 112.84 | M2 | 501 ₹56,532.84 | 700 ₹78,988 | 525.05 ₹59,246.64 | 530.53 ₹59,865.01 | 500 ₹56,420 Lowest |
| 9.00 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dsesign & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental officers. | 1.53 | M3 | 4,002 ₹6,123.06 | 1,300 ₹1,989 Lowest | 3,862 ₹5,908.86 | 3,902.27 ₹5,970.47 | 4,000 ₹6,120 |
| 10.00 | finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 20.45 | M2 | 1,302 ₹26,625.9 | 1,100 ₹22,495 Lowest | 1,281.27 ₹26,201.97 | 1,294.63 ₹26,475.18 | 1,150 ₹23,517.5 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
3 Aug 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER B.P,THITUVADANAI
UNION OFFICE THIRUVADANAI
MPLADS BUS STOP 25-26 PUDHUPATTINA
2026_RDTN_686942_1
MPLADS -25-26 PUDHUPATTINAM BUS STOP
Open Tender
Civil Works
Works
180 days
UNION OFFICE THIRUVADANAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
14 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work : CONSTRUCTION OF BUS SHELTER @ PUDHUPATTINAM VILLAGE AND PANCHAYAT. | - | - | - | - |
| 2 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B. | 17.02 | m3 | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site and all Labours etc | 4.28 | m3 | - | - |
| 4 | Supply and filling of conveyed earth by lorry in basement filling including stacking etc | 1 | m3 | - | - |
| 5 | Brickwall in cement mortar 1:5 mix including cost & conveyance of all materials to site including cost and labour charges incidental charges and curing etc., complete for super structure. | 10.66 | m3 | - | - |
| 6 | ReinforcedCement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site and all Labours etc | 14.09 | m3 | - | - |
| 7 | Supplying fabricating and placing in position of steel rod for reinforcement including cost of steel, binding wire etc., complete complying with reluctant standard specifications | 1,210.83 | KG | - | - |
| 8 | Towards centering and Shuttering including all required wooden Materils and Labours etc | 112.84 | M2 | - | - |
| 9 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dsesign & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental officers. | 1.53 | M3 | - | - |
| 10 | finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 20.45 | M2 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_825745.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].