Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-Finance | ₹13.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹16.6 L+₹3.1 L (23.1%)Rejected-Finance | ₹16.6 L+₹3.1 L (23.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹17.1 L+₹3.7 L (27.3%)Rejected-Finance | ₹17.1 L+₹3.7 L (27.3%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical BENARSI DAS AJAY PAL SINGH 413B MOH BENARSIDAS AURAIYA AURAIYA UTTAR PRADESH 206122 | AURAIYA | UTTAR PRADESH | 206122 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.6 L
EMD Value
₹36,000
Closing Date
27 Dec 2021, 11:00 amClosed
E.E. MGCD-7 Bijnor
BIJNOR
Construction of V.R.B at.km 19.070 of panwasa dy.
2021_UPIDC_660098_3
03/EE/2021-22
Open Tender
Civil Works
Item Wise
sambhal
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹36,000
Yes
5 Dec 2025
20 Dec 2021
27 Dec 2021
20 Dec 2021
27 Dec 2021
20 Dec 2021
Amount
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete in 1:3:6 including all cost of material, labour , T&P etc. for completion of work per cum.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. Per cum
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm.
For C.C. Work
For R.C.C. Work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work. R/M
Supply and laying Tarfelt sheet in three layers on Bed Block including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and fixing wheel gaurd all cost of material, labour and T&P etc. complete. Per sqm.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete. Per sqm.
Earth work in filling in ordinary soil including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer-in-Charge.
Dry brick on edge soling laid dry filling joints including all cost of material, labour and T&P etc. all complete. Per sqm.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per No..
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete. Per No..
YADVENDER SINGH CONTRACTOR
M/S BALAJI ENTERPRISES CONTRACTOR
stage.html
html • 0.05 MB
technical_1044862.pdf
techsummary_1044862.pdf
finance_1044862.pdf
BOQ Comparative Chart
xlsx
finsummary_1044862.pdf
cancelled_1.pdf
pdf • 0.29 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
L7.pdf
Tender Documents • 1.07 MB
BOQ_1044862.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .