Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.9 LAdmitted-Finance VILLAGE NUSRATABAD KHARKHADI POST LONI DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | -7.80% | ₹28.9 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Disqualified due to Turnover is not attached for immediate last-3 Consecutive Year |
Tender Value
₹31.3 L
EMD Value
₹73,860
Closing Date
6 Aug 2026, 5:00 pmClosed
Senior Manager(Civil)
TDS City, Ghaziabad
Upgradation of Approach Road in Village Khanpur Japti I.A. TDS City Ghaziabad
2026_SIDC_1173298_1
CD-III(78) dt. 05.06.2026
Open Tender
Civil Works
Percentage
120 days
I.A. TDS City
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,206
Executive Engineer
₹73,860
10 Sept 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas. | 262 | Cum. | 110 | ₹28,820 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 65.5 | Cum. | 169.91 | ₹11,129.11 |
| 3 | Cartage of earth ….. Upto 2 km | 183.5 | Cum. | 124.8 | ₹22,900.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:- 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 41.92 | Cum. | 4,300 | ₹1,80,256 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:6 (1 cement : 4 coarse sand) | 270.8 | Cum. | 5,010 | ₹13,56,708 |
| 6 | Cement Concrete with 2cm gauge Stone approved stone ballast, coarse sand & cement in Proportion of 1:2:4 including supply of all material , labour, tools & plants etc. require for proper completion of work. | 12.51 | Cum. | 7,050 | ₹88,195.5 |
| 7 | 12 mm cement plaster of mix : (1 cement: 4 Coarse sand) | 1,123.52 | Sqm. | - | - |
| 8 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,440 | kg | - | - |
| 9 | Supply & Laying Spreading And Compacting 22.5 mm to 53 mm size Stone Aggregate of Specified Sizes to WBM specification of uniform thickness,hand /picking ,rolling with 3 wheeled Road vibratory roller 8-10 tonne capacity in stages to proper grade and camber ,applying and brooming requisite type of screening /binding material to fill the interstices of coarse aggregate ,watering and compacting to fill the required Density. | 46.91 | Cum. | 2,022.9 | ₹94,894.24 |
| 10 | Supply & Stacking of Screening material approved quality of consolidation of stone ballast including of material labour T& P etc. required for proper completion of work . | 9.38 | Cum. | 1,977.75 | ₹18,551.3 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
NITKHANPURJAPTI.pdf
Tender Documents • 1.13 MB
BOQ_2203401.xls
BOQ • 0.29 MB
FEE.xls
Additional Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .