Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | Admitted-Finance |
| 2 | Admitted-Finance 1ST FLOOR WZ 409 PLOT NO 12 JANAK PARK HARI NAGAR WEST DELHI DELHI 110064 | WEST | DELHI | 110064 | Admitted-Finance |
Tender Value
₹34.2 L
EMD Value
₹68,440
Closing Date
22 Jul 2025, 3:00 pmClosed
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi - 110016
SITC of Scale Prevention Device in Condenser Pipeline of LHC and SIT Chiller ACs in IIT Delhi
2025_IIT_867932_1
IITD/WORKS (SP-5054)/2025
Open Tender
Miscellaneous Works
Works
35 days
Indian Institute of Technology Delhi Hauz Khas
As per tender documents
14 documents required · 14 mandatory
₹0
₹68,440
1 Aug 2025
8 Jul 2025
23 Jul 2025
8 Jul 2025
22 Jul 2025
8 Jul 2025
Amount
Supply, Installation, Testing and Commissioning of On-line, non-chemical Water Treatment Scale Preventor system / device in the existing condenser pipeline, compatible with the size of pipe and flow of water including making modifications in the existing pipe (cutting as per size, welding, flange fixing, gasketing, etc.). The device shall be modular and be able to prevent the formation of scale inside the condenser pipe due to hard water, the inner core of the device shall be able to convert the hardness causing salts into colloidal particles without drawing any external electrical power, body of the unit shall be made of SS 304 or higher grade, etc. complete as required for the following capacity chiller units. a] Defect Liability Period (DLP) is one year after commissioning. 'b] Contractor shall have to monitor the performance of the Scale Preventer device quarterly basis upto 5 years beyond DLP c] Every alternate month (but from March to October every year) recirculated water of the cooling tower shall have to be collected by OEM Engineers (authorised technical person) and will have to be tested from Govt approved Lab to check pH and conductivity. A computer simulation report shall be submitted after every water test reports for evaluating performance. d] Cooling tower shall have to be inspected for sludge formation (colloid particle) and will have to be cleaned by the contractor with the help of the operator. e] The above activities shall have to be carried out by the Contractor upto 6 years after commissioning. f] 30% of the tendered amount shall be retained as Security for Performance which shall be released yearwise proportionately after post-installation compliances as above.
135 TR Chiller AC Plant (Location: SIT Bldg)
300 TR Chiller AC Plant (Location: LHC Bldg.)
Blue Star Limited (BID ID -3248682)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .