Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹5.0 LAccepted-Finance | ₹5.0 L | Ist | Accepted-Finance L-1 Bidder |
| 2 | IInd₹5.5 LRejected-Finance | ₹5.5 L | IInd | Rejected-Finance L-2 Bidder |
| Sl No | Description | Qty | Unit | Technocrat Electrical L1 | Gupta Elect and Engg Works L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling & safe stacking of Emulsifier air pipe line, water pipe line. | 1 | Job | 10,000 ₹10,000 | 500 ₹500 |
| 1.02 | Drain out of the T/F oil from 160 MVA tank to empty oil drum/oil tanker including opening of valve and filling in empty oil drums and proper stacking. | 1 | Job | 10,000 ₹10,000 | 500 ₹500 |
| 1.03 | Dismantling of 160 MVA T/F HV/IV/LV/Neutral Bushing and its turret opening of all pipe line 6", 4", 3", 2" & 1" inlet, outlet valve, inspection cover Bucholz relay, OSR, PRV, OLTC tank, MOG for replacement of gasket. | 1 | Job | 35,000 ₹35,000 | 50,000 ₹50,000 |
| 1.04 | Replacement of old and damaged "O" ring type Top cover gasket size 12mm/16mm for main tank top cover of 160 MVA Transformer of good quality rubberized cork sheet Kitika/telbronze/NE Cork make involving the work of opening all the nut bolts of top cover plate, lifting the top cover, cleaning the top cover, removing the old & damaged gasket and its removal for surface by scratching and cleaning. | 1 | Job | 8,000 ₹8,000 | 60,000 ₹60,000 |
| 1.05Replacement of old and damaged gasket of 160 MVA T/F make of good quality rubberized cork sheet Kitika/telbronze/NE Cork make at following details below. | |||||
| 1.06 | Providing and making of HV Turret Gasket. | 3 | No. | 3,000 ₹9,000 | 1,500 ₹4,500 |
| 1.07 | Providing and making of HV Bushing Gasket. | 3 | No. | 1,500 ₹4,500 | 1,500 ₹4,500 |
| 1.08 | Providing and making of IV Turret Gasket. | 3 | No. | 2,000 ₹6,000 | 800 ₹2,400 |
| 1.09 | Providing & making of IV Bushing Gasket. | 3 | No. | 800 ₹2,400 | 800 ₹2,400 |
| 1.10 | Providing & making of LV Bushing Gasket. | 3 | No. | 1,000 ₹3,000 | 800 ₹2,400 |
Updated dates
Tender Value
₹6.5 L
EMD Value
₹8,000
Closing Date
2 Dec 2025, 12:00 pmClosed
SE, ETC, Varanasi
Bhikharipur, DLW, Varanasi
REPLACEMENT OF GASKET OF 160MVA TRANSFORMER-I, (BHEL MAKE)
2025_UPTCL_1084134_2
Short Term E-Tender No. 45/2025-26/ETC-I/VNS
Open Tender
Electrical Works
15 days
220 KV Substation Gajokhar
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹590
SE, ETC, Varanasi
₹8,000
Yes
25 May 2026
19 Nov 2025
3 Dec 2025
19 Nov 2025
2 Dec 2025
21 Nov 2025
Amount
Dismantling & safe stacking of Emulsifier air pipe line, water pipe line.
Drain out of the T/F oil from 160 MVA tank to empty oil drum/oil tanker including opening of valve and filling in empty oil drums and proper stacking.
Dismantling of 160 MVA T/F HV/IV/LV/Neutral Bushing and its turret opening of all pipe line 6", 4", 3", 2" & 1" inlet, outlet valve, inspection cover Bucholz relay, OSR, PRV, OLTC tank, MOG for replacement of gasket.
Replacement of old and damaged "O" ring type Top cover gasket size 12mm/16mm for main tank top cover of 160 MVA Transformer of good quality rubberized cork sheet Kitika/telbronze/NE Cork make involving the work of opening all the nut bolts of top cover plate, lifting the top cover, cleaning the top cover, removing the old & damaged gasket and its removal for surface by scratching and cleaning.
Replacement of old and damaged gasket of 160 MVA T/F make of good quality rubberized cork sheet Kitika/telbronze/NE Cork make at following details below.
Providing and making of HV Turret Gasket.
Providing and making of HV Bushing Gasket.
Providing and making of IV Turret Gasket.
Providing & making of IV Bushing Gasket.
Providing & making of LV Bushing Gasket.
Providing & making of Neutral Bushing Gasket.
Providing & making of inspection cover Gasket.
Providing & making of OLTC pocket Inspection cover Gasket.
Providing & making of LV Neutral Inspection cover Gasket.
Providing & making of Gasket for Expansion bellow 200 mm. (03 Nos.) 80 mm. (01 No.)
Providing & making of 6" Butterfly valve Gasket.
Providing & making of Gasket for CT Inspection cover HV
Providing & making of Gasket for CT Inspection cover IV
Providing & making of Gasket for WTI/OTI pocket
Providing & making of Gasket for Header
Providing & making of Gasket for NRV
Providing & making of Butterfly valve Gasket for Radiator 80 mm.
Providing & making of 8" Butterfly valve Gasket.
Providing & making of Surge relay Gasket.
Providing & making of Gasket Buchholz Relay.
Providing & making of Gasket of PRV.
Providing and making of gasket of MOG.
Providing & making of 15mm. dia valve Gasket.
Providing & making of 1" dia valve Gasket.
Providing and making of 2" dia valve Gasket.
Providing and making of 4" dia valve Gasket.
Providing and making of 6" dia valve Gasket.
Providing and making of flow indicator Gasket.
Providing and making of gasket of oil pump.
Providing and making of gasket of Conservator tank.
Providing and making of gasket of OLTC tank.
Providing and making of nylon washer of radiator bushing, air releasing plugs.
Erection of turret HV/LV/TV side and erection of Bushing oil pipe line 6", 4", 3", 2" & 1" Gear box, OLTC pipe line, pump, flow meter, inspection cover, MOG etc. for complete work.
Complete evacuation of 160 MVA Transformer main tank and filling of Dry Air/Dry Nitrogen of dew point-50°c or better in vaccum Pressure of 0.25 Kg/squr cm. and then again evacuating Transformer After required time interval (approx. 12/24 hours) using centrifuging machine. The work shall include connecting pipe of machine as required measuring dew point values of N2 after every cycle till the required value is achieved.
Draining & flushing of T/F core winding in main tank with hot T/F oil through centrifuging machine.
Vaccum inside the tank and filling the T/F oil.
Centrifuging of T/F oil already fill in oil tanker taking IR/BDV/PPM value of T/F oil at an interval of 06 Hrs. as per norms. After the desire value top up the centrifuging T/F at required level (Machine shall be provided by contractor) (Approx. 49.16 KL).
Filling of the TF oil into Main tank & radiators from oil tanks under vaccum after performing vaccum stand test succesfully
Oil testing of TF oil after 15 days of energization BDV, PPM & DGA from approved laboratory.
Erection of Emulsifier system air of the water pipe line replacement of gasket & tightening nut and bolts.
Carriage of oil tank 20/35 KL any where within 100 Km. including loading, unloading and carriage at 220 KV S/S Gajokhar.
Rubbing cleaning and painting of 160 MVA T/F including emulsifier water & air pipe line with one coat of primer and 2 coat of existing colour synthetic enamel paint of 1st quality ASIAN/BERGER/NEROLAC make etc.
jumpering of HV/LV side bushing of the Transformer the scope of work envolving tightning of bushing clamps with appropriate size of bolts & nuts encluding replacement of clamps ,jumper are required cost enclude all labour and T&P but excluding the cost of jumper , clamp , bolt/nut which shall be provided by upptcl free of cost
Gupta Elect and Engg Works (BID ID -5704090)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Documents.pdf
Tender Documents • 0.84 MB
BOQ_2006596.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid