Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9 LAccepted-AOC AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 1 | Accepted-AOC L I BIDDER | |
| 2 | 2₹6 L−₹3 L (33.3%)Accepted-AOC | 2 | Accepted-AOC FIRM AGREE TO WORK AT L I RATES | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT QUALIFIED AS PER PQC |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
11 Nov 2019, 4:00 pmClosed
SE OMC I BTPS ANPARA
OFFICE OF THE SE OMC I BTPS ANPARA
Breakdown maintenance overhauling Servicing of pumps blowers mixers valves clarifiers attending the leakage of pipe line replacement of damage structure railings supports of pipe lines vessels etc and other allied works of WTP CPP BTPS
2019_RVUNL_385664_1
T05/OGD/BTPS/19-20
Open Tender
Miscellaneous Works
Fixed-rate
365 days
BTPS ANPARA SONEBHADRA
AS PER PQC
3 documents required · 3 mandatory
₹1,180
DY CAO CFA AND BO BTPS ANPARA
₹30,000
5 Feb 2020
30 Sept 2019
14 Nov 2019
30 Sept 2019
11 Nov 2019
30 Sept 2019
Amount
Complete overhauling / servicing of following pumps, blowers, Fan, mixers etc. this includes the complete dismantling of the equipment, cleaning & checking, re-visioning of various parts, replacement of worn out parts, if required by new / repaired parts, alignment of auxiliary with motor and coupling. All overhauled / serviced equipment must be re-painted with one coat of Epoxy primer & two coat of Epoxy paint for the protection of pump, etc. after completion of work. Re-commissioning of equipment & trial run. [one job will be given for each pump / Blowers / Fan / Mixture / Clarifiers basis]
Raw Water Pump
Sludge Pump
Filter Back Wash Pump
Clarified Water Pump
Service Water Cooling Pump
Coagulant dosing pump (Reciprocating type)
Coagulant Transfer pump
Demin Plant Inlet Pump
Degasser Water Booster
Regeneration
D. M. Transfer
Alkali Preparation
Anion Hot Water
Acid Transfer
CPP Booster
CPP Regeneration
Ammonia Recycle
Ammonia Unloading
Sump Pump
Pit -3 Dewatering pumps
Discharge Pump
Ammonia transfer pump
Phosphate transfer pump
Hydrazine transfer pumps (Gear pump)
Ammonia injection pump
Hydrazine injection pumps
Phosphate injection pump
Submersible sump pumps 1.5Kw
Submersible sump pumps 0.75 Kw
Submersible sump pumps 3.7Kw
BLOWER & FANS
Filter Back wash Air Blower [PT Plant]
Demin Air Blower [DM Plant]
Regeneration Unit Air Blower [CPP]
Air Blower [Waste Water System]
Degasser Fan [DM Plant]
Mixers with Vertical Spindle & Motor Driven,
CLARIFICATOR
CLARIFICATOR oil pump Drive
Clarifier Scrapper & Turbine Drive
PART-B BREAK-DOWN MAINTENANCE
This includes generally the jamming of pumps due to ingress of foreign material in pump casing/ impeller. For attending the pump has to be dismantled from suction side/ delivery side, including realignment of pump. For removal of choking in the bearing cooling/ gland cooling all the connected lines has to be dismantled & cleaned thoroughly & then assembly of system. For changing ratchet plate, spacers, stuffing box, sealing ring, etc. the motor above the pump has to be lifted & fault has to be attended by dismantling the other necessary parts of pump. After attending the fault the system has to be normalized for running including placement of motor alignment & coupling.
RAW WATER PUMP,SUMP PUMP CPP & PIT-3 SUMP PUMP.
Replacement of ratchet plate
Replacement of worn out gland cover of stuffing box holding bolts.
Replacement of worn out rubber spacer of coupling.
Replacement of worn out bearing.
Replacement of sealing ring of stuffing box.
HORIZONTAL CENTRIFUGAL PUMPS
Removal of jamming of impeller because of ingress of foreign material.
Replacement of damaged bearings of pumps.
Replacement of worn-out pump casing gasket / 'O' ring.
Removal of jamming of Alum transfer pump.
RECIPROCATING TYPE PUMP
Replacement of Pump Diaphragm.
Replacement of Venire Pump
Arresting of pump leakage either from pump oil side or from chemical side.
Replacement of pump coupling/ Coupling hubs & associated works.
PART-C GENERAL BREAK-DOWN
Providing of new foundation bolts, casing bolts/studs etc. of the equipment after taking out broken studs/bolts by way of drilling tapping etc. on channel foundation
Replacement of following valves with new / repaired valves by dismantling and of old valve from system and fitting of new / repaired valve.
Butterfly valve ( 50 mm to 600 mm)
Plug Valve ( 20 mm to 200 mm)
Diaphragm valve (08 mm to 200 mm)
Check Valves ( 25 mm to 500mm)
Ball Valve ( 40mm to 100mm)
Gate valve( 15mm to 300 mm)
Re-visioning /overhauling / servicing of hand/ pneumatic/ electrical operated following valves only mechanical portion of valve.
Butterfly valve ( 50 mm to 600 mm)
Plug Valve ( 20 mm to 200 mm)
Diaphragm valve (08 mm to 200 mm)
Check Valves ( 25 mm to 500mm)
Ball Valve ( 40mm to 100mm)
Gate valve( 15mm to 300 mm)
Pump Re-circulation valve(200NB)
Instrument Isolating valve (1/2 " to 3/8")
Modulating control valve(100mm NB)
Pressure reducing & pressure relief valve of following size
Servicing & Overhauling of pneumatic / electrically operated penstock gates of gravity filter, channel inlet, gravity filter inlet & gravity filter back wash outlet only mechanical portion.
Replacement of C.I./ M.S. Pipe of flange/ weld joint including removal of old pipe (20mm to 450mmNB) by cutting including dismantling & transportation to WTP store. . [This includes laying, transportation of pipe & necessary required material from store to work site lifting to work site, cutting, welding, preparation of necessary bend, tee, off set, of pipe lines, clamping, providing vent if required, jointing with nut bolts, welding, welding of flanges, valves including removal of old pipe (15 to 450NB) by cutting including dismantling & transportation to WTP store & any other work required for the completion of pipeline etc.]
Erection of New C.I. / M.S./G.I./ MSRL/HDPE Pipe of flange/ weld joint (15mm to 450mmNB) [This includes laying, transportation of pipe & necessary required material from store to work site lifting to work site, cutting, welding, preparation of necessary bend, tee, off set, of pipe lines, clamping, providing vent if required, jointing with nut bolts, welding, welding of flanges & valves, & any other work required for the completion of pipe line etc. Note:- For the painting of erected pipelines with one coat of primer of first quality, followed by two coats of approved colour of first quality paint, item no. Part –D, 1,2,3 & 4 can be utilised, and Item no. Part – E- a) & b) can be utilised for the erection of support & structure.]
Attending the leakages from sludge pipeline joints including joint dismantling, re-fixing/replacement of rubber ring & rejoining with alignment.
Attending the leakage from 25mm to 450 mm pipeline of DM water transfer pipe, Service water pipe, Waste water pipe & other miscellaneous pipes by cutting welding etc. including excavation, Dewateriing if required and back filling etc.
Attending the leakages from Acid/ Alkali transfer pipeline joints (Made of HDPE) including joint dismantling, re-fixing /replacement & rejoining(By Mirror jointing kit or suitable jointing resin ) with alignment.
Part –D: Surface protection & Painting work as and when required to prevent damage of system by chemical reaction.
Surface cleaning, preparation & application of one coat of Epoxy primer (Epilux-610) on the old surface for protection of surface up to 5 sq. meter in single job.
Application of two coat Epoxy paint (Epilux- 4) on the old surface for protection of surface up to 5 sq. meter in single job.
Surface cleaning, preparation & application of one coat of primer paint on the old surface for protection of surface up to 5 sq. meter in single job.
Application of two coat Enamel paint on the old surface for protection of surface up to 5 sq. meter in single job.
Repairing of damage Acid proof Brick Lining with old brick to complete the work.
Pointing work of brick lining including cost of material required to complete the work.
Mastic lining work including cost of material required to complete the work.
Resin lining work including cost of material required to complete the work.
Part-E: Repair & fabrication of various structures & new items.
Replacement of damage structure, railing & support of vessels.
Fabrication of Flange of different sizes From MS/Steel Plate by cutting/drilling/grinding etc.
Fabrication of Pipe/bend/reducer/Tee of different sizes fram MS pipe by cutting,welding/bending/drilling and grinding etc (by new/old MS pipe)
Fabrication work of the various structure /and item by using various steel sections [new / old taken from scrap]
Part-F: Overhauling & repairing of Gravity Filters
Removal of filter media by collection , lifting from the bed of filter ,stacking at ground floor on clean surface, cleaning by water, sheaving with different size of sheaves, separation of filter media in different size, refilling as per instruction of Engineer of contract in filter in different thickness after repairing of filter's internal, replacement of damaged parts & necessary repair if any complete in all respect
Epoxy painting two coats after cleaning & preparation of surface on the internal/ external surface of filters only with item no Part-F (a).
Black Bitumen Acid/ Alkali resistant paint coating two coats after cleaning & preparation of surface on the external surface of filter's structure ( Valves Side) only with item no Part-F (a).
Repairing / replacement, cleaning of filter air/ water nozzles & other internals, including any necessary repair for the completion of work etc. including epoxy painting one coat of primer, two coats of epoxy paint after cleaning & preparation of surface on the internal fitting of metallic part of filter only with item no Part-F (a).
Part-G: Transportation of Chemicals & Lubricants & other materials
Loading & unloading, transportation & stacking of chemicals /lubricant from central stores to various site store or inter stores.
Solid /liquid chemicals
Liquid chemicals
Loading, unloading, transportation & stacking of light chemicals, glass lab wares and other misc. material from central store to site store or inter stores.
Shifting of chemicals from WTP site stores to express laboratory / Coal Lab / CPP.
Part-H: Work of Brian Treatment
Help in Brine treatment of anion bed resin of DM water Stream
Help in Brine treatment of mixed bed anion resin of DM water Stream
M/S NISHA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .