Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.3 Cr+₹16.3 L (3.19%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L2₹5.3 Cr+₹16.3 L (3.19%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Seven Square power solutions L2 | Greenlink Infra L2 | ENERGCA INFRA L1 |
|---|---|---|---|---|---|---|
| 2.00PART 2 | ||||||
| 2.01 | SITC of 1000 kVA (1MVA), 22kV/433V, Level III, Oil Immersed (As per Specifications mentioned in Annexure A) | 1 | Each | 76,91,790 ₹76,91,790 Lowest | 76,91,790 ₹76,91,790 Lowest | 77,97,963 ₹77,97,963 |
| 2.02 | SITC of 2000 kVA (2MVA), 22kV/433V, Level III, Oil Immersed (As per Specifications mentioned in Annexure A) | 1 | Each | 97,60,345 ₹97,60,345 | 97,60,345 ₹97,60,345 | 96,40,230 ₹96,40,230 Lowest |
| 2.03 | SITC of Transformer Electronic Control Unit (Smart RTU Smart (As per Specifications mentioned in Annexure A) | 1 | Each | 5,21,890 ₹5,21,890 Lowest | 5,21,890 ₹5,21,890 Lowest | 5,81,757 ₹5,81,757 |
| 2.04 | SITC of 1000 KVA (1 MVA)Turnkey Integrated Outdoor Smart Prefabricated (As per Specifications mentioned in Annexure A) | 1 | Each | 1,45,77,630 ₹1,45,77,630 | 1,45,77,630 ₹1,45,77,630 | 1,35,78,569 ₹1,35,78,569 Lowest |
| 2.05 | SITC of 2000 KVA (2 MVA)Turnkey Integrated Outdoor Smart Prefabricated (As per Specifications mentioned in Annexure A) | 1 | Each | 1,88,12,321 ₹1,88,12,321 | 1,88,12,321 ₹1,88,12,321 | 1,80,34,870 ₹1,80,34,870 Lowest |
| 2.06 | SITC of Environmental Smart CSS Infrastructure suite including 3 Precision Temp (As per Specifications mentioned in Annexure A) | 1 | Each | 7,80,243 ₹7,80,243 Lowest | 7,80,243 ₹7,80,243 Lowest | 8,15,678 ₹8,15,678 |
| 2.07 | SITC of UL-Certified Autonomous Inert-Gas / Clean-Agent Fire (As per Specifications mentioned in Annexure A) | 1 | Each | 4,89,231 ₹4,89,231 Lowest | 4,89,231 ₹4,89,231 Lowest | 5,57,231 ₹5,57,231 |
Tender Value
Refer Docs
Closing Date
8 Oct 2026, 3:00 pmClosed
Joint City Engineer (Ele)
Pcmc Pimpri
Rate Analysis of Transformer For New Main Administrative Building of PCMC.
2026_PCMCP_1341483_1
HO/Elect/37/26-27
Open Tender
Electrical Works
Item Rate
PCMC Pimpri
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
22 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
8 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2PART 2 | |||||
| 2.01 | SITC of 1000 kVA (1MVA), 22kV/433V, Level III, Oil Immersed (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.02 | SITC of 2000 kVA (2MVA), 22kV/433V, Level III, Oil Immersed (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.03 | SITC of Transformer Electronic Control Unit (Smart RTU Smart (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.04 | SITC of 1000 KVA (1 MVA)Turnkey Integrated Outdoor Smart Prefabricated (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.05 | SITC of 2000 KVA (2 MVA)Turnkey Integrated Outdoor Smart Prefabricated (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.06 | SITC of Environmental Smart CSS Infrastructure suite including 3 Precision Temp (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
| 2.07 | SITC of UL-Certified Autonomous Inert-Gas / Clean-Agent Fire (As per Specifications mentioned in Annexure A) | 1 | Each | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2293059.xls
BOQ • 0.33 MB
1341483.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .