| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAdmitted-Finance K K M TOWER KANDHIKUPPAM POST BARGUR TALUK KRISHNAGIRI DISTRICT 635 108 | KRISHNAGIRI | TAMIL NADU | 635108 | ₹15.5 L | L1 | Admitted-Finance |
| 2 | L2₹15.5 LAdmitted-Finance | ₹15.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KKM Construction L1 | Kannaiyan Contractor L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Drainage From Kandhikuppam Junction Road H/o. Kandhikuppam Rs-15.61Lakhs | |||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart | 183.75 | Cum | 164.71 ₹30,265.46 | 165.68 ₹30,443.70 |
| 3.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 26.25 | Cum | 5,276.4 ₹1.4 L | 5,307.56 ₹1.4 L |
| 4.00 | 3. Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton | 600 | Sqm | 547.01 ₹3.3 L | 550.24 ₹3.3 L |
| 5.00 | Slab Bottom | 98.31 | Sqm | 1,094.01 ₹1.1 L | 1,100.48 ₹1.1 L |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 1.09 | Mtr | 91,775.83 ₹1.0 L | 92,317.79 ₹1.0 L |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 69 | Cum | 6,026.77 ₹4.2 L | 6,062.36 ₹4.2 L |
| 8.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 13.61 | Cum | 8,994.75 ₹1.2 L | 9,047.86 ₹1.2 L |
| 9.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 112.5 | Sqm | 585.04 ₹65,817 | 588.5 ₹66,206.25 |
| 10.00 | Providing Name board including Painting and lettering etc complete. | 1 | Each | 999.1 ₹999.10 | 1,005 ₹1,005 |
Tender Value
₹15.6 L
EMD Value
₹16,000
Closing Date
5 Mar 2026, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri Dt Bargur Block UGF 2025_26 Construction of Drinage From Kandhikuppam Junction Road at Kandhikuppam Panchayat BRG_81
2026_RDTN_669140_1
1618_2025_A5_Dt_14_02_2026
Open Tender
Civil Works - Others
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,000
6 Mar 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
1.Construction of Drainage From Kandhikuppam Junction Road H/o. Kandhikuppam Rs-15.61Lakhs
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
3. Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton
Slab Bottom
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Providing Name board including Painting and lettering etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TB_81.pdf
Tender Documents • 0.65 MB
PB_81.pdf
Tender Documents • 0.59 MB
BOQ_804035.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid