Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹20.9 L+₹13,614.46 (0.66%)Rejected-Finance 6 14 ADAIKALAPURAM VANNIKONENTHAL MANUR TALUK TIRUNELVELI DISTRICT | TIRUNELVELI | TAMIL NADU | 627001 | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | S P DEVARAJ L1 | PALRAJ CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of 5m Span Culvert with Protective wall near Mottaiyanoor PUPS in Ukkirankottai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 177.03 | Cum | 263.5 ₹46,647.41 Lowest | 300 ₹53,109 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete | 22.3 | Cum | 5,411 ₹1,20,665.3 Lowest | 5,450 ₹1,21,535 |
| 4.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete for 10 cum Below sill | 121.62 | Cum | 5,681 ₹6,90,923.22 Lowest | 5,700 ₹6,93,234 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete for 10 cum above sill | 108.49 | Cum | 5,681 ₹6,16,331.69 Lowest | 5,700 ₹6,18,393 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 2.15 | Cum | 6,702 ₹14,409.3 Lowest | 6,750 ₹14,512.5 |
| 7.00 | Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete for 10 cum | 9.98 | Cum | 9,022 ₹90,039.56 Lowest | 9,050 ₹90,319 |
| 8.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment/pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (country wood) scantlings of size 10 cm x 6.5 cm spaced of about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm ida spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc., | 570.94 | Sqm | 547.4 ₹3,12,532.56 Lowest | 550 ₹3,14,017 |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all RCC works including cost and conveyance of all materials to site | 2 | MT | 91,858 ₹1,83,716 Lowest | 91,880 ₹1,83,760 |
Tender Value
₹24.9 L
EMD Value
₹24,900
Closing Date
6 Nov 2025, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
Protective wall
2025_RDTN_619314_4
A2/5978/2025
Open Tender
Civil Works - Others
Lump-sum
180 days
Manur
Refer Tender doc
2 documents required · 2 mandatory
₹0
₹24,900
10 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_740339.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .