| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 CrAccepted-AOC | ₹11.4 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC LOA issued |
| 2 | L2₹11.9 CrRejected-Finance | ₹11.9 Cr | L2 | Rejected-Finance Due to High
pric |
Tender Value
₹10.3 Cr
EMD Value
₹23.1 L
Closing Date
22 Aug 2022, 3:00 pmClosed
SE(NH)Salem
O/o the Superintending Engineer, National Highways, Omalur main road Narasothipatty, Alagapuram (Po),Salem 636 004
Upgradation of Road from Harur - Sitheri Road Km 0/0-10/452.
2022_TNNH_119690_1
PMGSYNo5/HDO/NH/23/Dt13.7.22(1
Open Tender
Civil Works - Roads
270 days
Harur
Yes
4 documents required · 4 mandatory
₹0
₹23.1 L
O/o the SE(NH)Salem
8 Nov 2022
19 Jul 2022
22 Aug 2022
19 Jul 2022
22 Aug 2022
19 Jul 2022
22 Jul 2022
Amount
Upgradation of Road from Harur - Sitheri Road Km 0/0-10/452. Package No. TN-04-240 of Harur Block in Dharmapuri District.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading III
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 Kg/sqm on the prepared bituminous / granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801
Logo board
Sign board
Octagonal Board
Circular Board
Citizen board
Name board
Maintanance board
Provision for Kilometre Stones
Provision for Hectametre Stones
Provision for Thermaplastic paint
Provision for Studs
Provision for Hazard marker
Providing and erecting Single Sided Double Guard metal beam crash barrier System 1.70 m high, comprising of 3mm thick wall 'W' beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360. And dip galvanized having Zinc mass of 550 gms/sqm, minimum 950mm above road/ ground level, fixed on ISMC series channel vertical post 150x75x5mm spaced 2m centre to centre 312mmx83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specifications and as directed by the Engineer in charge. Metal beam Crash barrier Type -'A' "W" Double Guard.
Construction of box culvert 1.50 X 1.50 m At Km 8/000
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At Km 8/900
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At Km 9/415
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At KM 9/525
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At KM 6/730
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At KM 7/178
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1.50 X 1.50 m At KM 7/413
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of box culvert 1 cell of 2.00 X 2.00 m At Km 8/193
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of Box culvert 2 cells of 2.0x2.0m At Km 9/850
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Widening of box culvert 3.70X 2.50 m At Km 9/160
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.
Construction of Side Drain At Km 6/0-6/4 Left
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side
Providing Concrete for plain/reinforced concrete in open foundations, Sub structure Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., as per drawings and technical specifications clause 802, 803, 1202 & 1203 as directed.
Vibrated Reinforced Cement Concrete M-20 Grade, Nominal Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for Drain Cover slab
Supply and Fabrication of S-415 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required.
Construction of Side Drain At Km 8/2-8/6 Left
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side
Providing Concrete for plain/reinforced concrete in open foundations, Sub structure Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., as per drawings and technical specifications clause 802, 803, 1202 & 1203 as directed.
Vibrated Reinforced Cement Concrete M-20 Grade, Nominal Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for Drain Cover slab
Supply and Fabrication of S-415 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required.
Dismantling Existing CD works @ Km. 9/160 , , 6/730, 7/178, 7/413 , 8/193, 8/900, 9/415, 9/520, 9/850
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Foundation concrete @ 6/730,7/178,7/413.8/193,8/900,9/415,9/520
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Body wall 6/730,7/178,7/413.8/193,8/900,9/415,9/520 & Parapet 6/730,7/178,7/413.8/193,8/900,9/415,9/520
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
Construction of Protective work @ Km. ,5/100 - 5/200 ,8/900 - 9/000,
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Cement concrete 1 : 2: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.BELOW SILL
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Cement concrete 1 : 2: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.ABOVE SILL
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Protective works @ Km. 5/100 - 5/200 L
Protective works @ Km. 8/870 - 9/000 L
Protective works @ Km. 10/200-10/400 L
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year
For 2nd year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
T.JAYAPRAKASH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf