Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.1 LAccepted-AOC HARYANA HR | L-1 | Accepted-AOC Contract awarded being L-1 Contractor | |
| 2 | L-2₹13.0 L+₹91,013.08 (7.54%)Rejected-AOC VILL DEPOPARA BINNAGURI PO BINNAGURI DIST JALPAIGURI W B PIN 735 203 | JALPAIGURI | WEST BENGAL | 735203 | L-2 | Rejected-AOC Due to L-2 | |
| 3 | L-3₹13.4 L+₹1.3 L (11.0%)Rejected-AOC BHIWANI | BHIWANI | HARYANA | 127021 | L-3 | Rejected-AOC Due to L-3 | |
| 4 | L-4₹13.5 L+₹1.4 L (11.5%)Rejected-AOC NA | NA | NA | 121004 | L-4 | Rejected-AOC Due to L-4 | |
| 5 | L-5₹14.0 L+₹1.9 L (16.1%)Rejected-AOC BARA P S ALIPUR TEKARI DIST GAYA | GAYA | BIHAR | 804403 | L-5 | Rejected-AOC Due to L-5 |
Tender Value
₹16.1 L
EMD Value
₹36,140
Closing Date
25 Feb 2025, 5:00 pmClosed
VIJAY KUMAR BHAGOTIA
Sewani W.S. Divn. Bhiwani
Estimate for construction of pipe line at escape at RD 13000/R on Motipura Disty.
2025_HRY_427989_1
202560735823 0E4B 4004 8AE8 CE192108B5CB129IRR
Open Tender
Civil Works
Works
140 days
DEVAWAS
Estimate for construction of pipe line at escape at RD 13000/R on Motipura Disty.
3 documents required · 3 mandatory
₹1,000
₹36,140
Yes
11 Mar 2025
14 Feb 2025
27 Feb 2025
14 Feb 2025
25 Feb 2025
14 Feb 2025
Amount
HSR Item 7.21.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 3693.00 Through Rate
HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform HSR Rate(Rs.) 208.00 Through Rate
HSR Item 15.1.1.1-Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m HSR Rate(Rs.) 154.00 Through Rate
HSR Item 6.1.4-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 2911.00 Through Rate
HSR Item 22.169.2-Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 2. 600 mm dia RCC pipes. HSR Rate(Rs.) 2881.00 Through Rate
HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) HSR Rate(Rs.) 84.00 Through Rate
HSR Item 6.14.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 3875.00 Through Rate
HSR Item 6.33.1-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 1. Mild steel and Medium Tensile steel bars HSR Rate(Rs.) 60.00 Through Rate
HSR Item 21.28-Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, rehandling etc., complete in all respect to the satisfaction of Engineer-in-charge HSR Rate(Rs.) 298.00 Through Rate
D S CONSTRUCTION COMPANY (BID ID -1218238)
Manoj Kumar Contractor (BID ID -1219981)
THE FATEHGARH HARYANA CO OP L AND C SOCIETY LTD (BID ID -1219915)
MUKESH KUMAR (BID ID -1219935)
THE ALAMPUR CO-OP L&C SOCIETY LTD. (BID ID -1220384)
THE KHATU SHYAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED GOPALWAS (BID ID -1220323)
M.R. Infra and Company (BID ID -1220241)
SHAMSHER SINGH (BID ID -1220133)
THE JDS COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD (BID ID -1219238)
THE BHUNA SHREE GANESH COOPERATIVE LABOUR & CONSTRUCTION SOCIETY LTD (BID ID -1220108)
THE BAZZS COOPERATIVE L&C SOCIETY (BID ID -1220309)
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .