Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16,691.18Admitted-Finance | -36.00% | ₹16,691.18 | L1 | Admitted-Finance |
| 2 | L2₹19,559.98Admitted-Finance | -25.00% | ₹19,559.98 | L2 | Admitted-Finance |
| 3 | L3₹22,128.85Admitted-Finance | -15.15% | ₹22,128.85 | L3 | Admitted-Finance |
| 4 | L4₹22,167.97Admitted-Finance | -15.00% | ₹22,167.97 | L4 | Admitted-Finance |
| 5 | L5₹23,445.89Admitted-Finance | -10.10% | ₹23,445.89 | L5 | Admitted-Finance |
Tender Value
₹26,000
Closing Date
25 May 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
Refer to BOQ
2026_PWDJK_309827_1
E-NIT No 20/2026-27/1472-76/G Dated 12.05.2026
Open Tender
Civil Works
30 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
2 Jun 2026
13 May 2026
26 May 2026
13 May 2026
25 May 2026
13 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1 meter from cutting edge | 0.57 | Cum | 479.3 | ₹273.2 | BI01010001010000000000000515BI0100001114 |
| 2 | Providing and laying in position cement concrete of specified grade inclu. curing excluding the cost of centring & shuttering-All work upto plinth level 1:4:8 (1 cement: 4 fine sand : 8 graded stone aggregate 40mm nominal size) | 0.56 | Cum | 5,202.9 | ₹2,913.62 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade incl.curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.22 | Cum | 5,733.6 | ₹6,994.99 | BI01010001010000000000000515BI0100001114 |
| 4 | Centring & shuttering incl.strutting propping etc and removal of form work for Foundations, footings, bases of columns etc. for mass concrete. | 5.58 | SQM | 286.35 | ₹1,597.83 | BI01010001010000000000000515BI0100001114 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works upto plinth level in (1:2:4) grade with 20mm nominal size of crushed stone aggre-gates. | 0.42 | Cum | 6,591.25 | ₹2,768.33 | BI01010001010000000000000515BI0100001114 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 60 | Kg | 181.6 | ₹10,896 | BI01010001010000000000000515BI0100001114 |
| 7 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work incl. material , labour all leads , lifts and carriage of material by MT/HL. | 2.12 | Cum | 300 | ₹636 | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1002734.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid