Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance H NO 2298 VPO NINDANA TEHSIL MEHAM ROHTAK 124513 | ROHTAK | HARYANA | 124513 | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 L+₹1.7 L (30.8%)Admitted-Finance | ₹7.0 L+₹1.7 L (30.8%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical KILOI KHAS VPO KILOI KHAS | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | THE SHAYTAM SHIVAM SUNDRAM COOPERATIVE LABOUR AND CONSTRUCTIONS SOCIETY L1 | The Arnav Co-op. LandC Society Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | [11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate] | 1,785.4 | Sqm | 90 ₹1,60,686 Lowest | 100.44 ₹1,79,325.58 |
| 2.00 | [11.52]Cement rendering on plaster 1 mm thick [Through Rate] | 1,785 | Sqm | 89 ₹1,58,865 | 28.83 ₹51,461.55 Lowest |
| 3.00 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 1,234.02 | cum | 68 ₹83,913.36 Lowest | 80.91 ₹99,844.56 |
| 4.00 | [4.6]Extra for levelling and neatly dressing of disposed soil completely as directed by Engineer-in-charge. [Through Rate] | 1,814.73 | cum | 16 ₹29,035.68 Lowest | 21.39 ₹38,817.07 |
| 5.00 | [5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate] | 54.44 | cum | 75 ₹4,083 Lowest | 89.28 ₹4,860.4 |
| 6.00 | [5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar [Through Rate] | 14.38 | 1000 Nos. | 1,400 ₹20,132 Lowest | 1,726.08 ₹24,821.03 |
| 7.00 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 54.44 | cum | - | 4,139.43 ₹2,25,350.57 Lowest |
| 8.00 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Material Rate] | 186 | Kg. | 55 ₹10,230 Lowest | 63.24 ₹11,762.64 |
| 9.00 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 28.75 | cum | 4,250 ₹1,22,187.5 | 3,845.55 ₹1,10,559.56 Lowest |
| 10.00 | [7.71]Extra for laying brick work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. [Through Rate] | 23 | Cum per metre depth | 270 ₹6,210 Lowest | 284.58 ₹6,545.34 |
Tender Value
₹7.5 L
EMD Value
₹14,940
Closing Date
10 Mar 2026, 3:00 pmClosed
Executive Engineer
ENGG. CELL, MDU, ROHTAK
Construction of damaged wall and repair and desilting from storage water tank no - 2 in MDU Rohtak
2026_HRY_503605_1
2026F44F6E18 1974 4054 9F7B 6E457A61318B817MDU
Open Tender
Civil Works
Works
90 days
Rohtak
Construction of damaged wall and repair and desilting from storage water tank no - 2 in MDU Rohtak
2 documents required · 2 mandatory
₹1,000
₹14,940
Yes
8 Apr 2026
18 Feb 2026
11 Mar 2026
18 Feb 2026
10 Mar 2026
18 Feb 2026
18 Feb 2026 - 20 Feb 2026
[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate]
[11.52]Cement rendering on plaster 1 mm thick [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.6]Extra for levelling and neatly dressing of disposed soil completely as directed by Engineer-in-charge. [Through Rate]
[5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate]
[5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Material Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.71]Extra for laying brick work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. [Through Rate]
Credit of brick bats
for Old bricks cr
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_582297.xls
BOQ • 1.11 MB
AD0150268.pdf
Additional Documents • 2.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .