Loading…
Loading…
Tender Value
₹26.1 L
EMD Value
₹53,000
Closing Date
28 Sept 2026, 1:00 pmDue tomorrow
Executive engineer tubewell division gonda
Executive engineer tubewell division gonda
Modernization of the Divisional Workshop and Store of Tubewell Division Gonda, comprising partial demolition and dismantling of existing structures, brick masonry work , plain cement concrete/RCC works, plastering, flooring, earthwork, laying of khar
2026_UPIDM_1184482_1
01/EE/TWDG/2026-27
Open Tender
Civil Works - Others
Fixed-rate
120 days
Tubewell Division Gonda
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹53,000
Yes
11 Sept 2026
11 Sept 2026
29 Sept 2026
11 Sept 2026
28 Sept 2026
11 Sept 2026
11 Sept 2026 - 28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Modernization of the Divisional Workshop and Store of Tubewell Division Gonda, comprising partial demolition and dismantling of existing structures, brick masonry work , plain cement concrete/RCC works, plastering, flooring, earthwork, laying of kharanja, whitewashing, painting/distempering, and all other allied and incidental works, including all necessary labour, materials(excluding cement), tools, plants, equipments, scaffoldings, and other accessories required for the proper completion of the work, wherever specified, at Room Nos. 01 to 16 and 19, boundary wall, and open areas, complete in all respects as per the attached drawings/layout and instructions of the Engineer-in-Charge. Cement will be provided by department. | |||||
| 1.01 | Centering and shuttering for brick work,wall plaster, GC sheet removal and fixing, painting etc. | 647.26 | M² | 500 | ₹3,23,630 |
| 1.02 | Dismantling of brick work 23 CM of wall | 65.21 | M³ | 570 | ₹37,169.7 |
| 1.03 | Brick Work 1:4 CM (23 cm thick) New | 74.37 | M³ | 5,917 | ₹4,40,047.29 |
| 1.04 | Brick Work 1:4 CM (23 cm thick) Old | 14 | M³ | 2,227 | ₹31,178 |
| 1.05 | CC 1:4:8 CM with Brick Ballast | 46.14 | M³ | 5,977 | ₹2,75,778.78 |
| 1.06 | CC 1:2:4 CM with stone grite | 48.16 | M³ | 8,959 | ₹4,31,465.44 |
| 1.07 | Cement plaster 1:4 CM(12 mm thickness) | 1,955.46 | M² | 231 | ₹4,51,711.26 |
| 1.08 | Tiles work on floor | 15.07 | M² | 1,980 | ₹29,838.6 |
| 1.09 | RB work in 1:3 CM (Excluding Reinforcement) | 3.35 | M³ | 6,032 | ₹20,207.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
01EETWDG.pdf
Tender Documents • 3.06 MB
BOQ_2228341.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .