Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-GST linked bank account number not disclosed |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-sb |
Tender Value
₹1.4 L
EMD Value
₹6,795
Closing Date
19 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Improvement of lane/soakage pit from Abdul Salam to house of Abdul Khaliq Dar and 2 no Soakage pit at different spot at Wani Mohalla
2026_RDPR_318565_25
NIT_22_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
NARBAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹6,795
14 Sept 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
19 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 14.8 | Cum | 479.3 | ₹7,093.64 |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth. Nallah including carriage | 10.2 | Cum | 3,199.11 | ₹32,630.92 |
| 3 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones. | 13.62 | Cum | 1,299 | ₹17,692.38 |
| 4 | Providing and laying in position 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level incl carriage | 1.07 | Cum | 8,321.32 | ₹8,903.81 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 84 | kg | 115 | ₹9,660 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms | 1.31 | Sqm | 718.2 | ₹940.84 |
| 7 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 5.56 | kl | 167.8 | ₹932.97 |
| 8 | Providing and fixing in position precast R.C.C. manhole cover and frame of required shape and approved quality. HD - 20 Circular shape 560mm internal diameter | 2 | no. | 1,677.1 | ₹3,354.2 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes [ WBM G-II Agg. 63-45 mm @ 0.91cum/10sqm (G-II), Screening (Type-A) of 13.2 mm size @0.135/10sqm and Binding material@ 0.06 cum/10sqm] to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller of 8-10 tonne capacity in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate,watering and compacting to the required density including carriage of all the required materials from source to site | 6.69 | Cum | 2,854.7 | ₹19,097.94 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl carriage | 5.45 | Cum | 6,323.55 | ₹34,463.35 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1050494.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .