Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC ASANSOL T P ROAD USHAGRAM BARDHAMAN WEST BENGAL 713303 | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | - | Rejected-Technical Not As per NIT L3 | |
| 3 | Rejected-Technical 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | Rejected-Technical Not As per NIT L2 |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
18 Sept 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Repairing/Rewinding of 300kW, 3.3kV, 1460 RPM, NGEF make Sq. Cage Induction Motor installed with 2nd series pump of PIT Bottom Pumping Station of Chinakuri Mine-I Colliery under Sodepur Area
2024_ECL_316977_1
ECL/SDPA/AE(EnM)/e-T/24-25/719 Dated.05.09.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
2 May 2025
7 Sept 2024
19 Sept 2024
7 Sept 2024
18 Sept 2024
7 Sept 2024
7 Sept 2024 - 12 Sept 2024
Amount
Items Description
Repairing/Rewinding of 300kW, 3.3kV, 1460 RPM, NGEF make Sq. Cage Induction Motor installed with 2nd series pump of PIT Bottom Pumping Station of Chinakuri Mine-I Colliery under Sodepur Area
Dismantling of Complete Motor
Cleaning & Decarbonizing of core slots
Supply of New Electrolyte grade Supper Enamelled Copper Strips
Insulation with F class insulation materials of stator coil with varnish after proper backing
Supply of tape suitable for HT motor
Supply of Nomax paper for stator core insulation
Supply of Varnish Sweet table for HT motor
Supply of thinner suitable for HT motor
Taking out of the coils from the stator slots
Formation of coils with the converted DG Copper Conductor
Interlayer insulation of the coil to be done with Kaftans tape
Labour charges for insulation of overhauling portion of the coils with GMP & GM tape
Inserting of the coils into the core slots in chronological manner
Fabrication of both sides bearing housing of the motor after making pattern MS casting machining appropriate size as per original size
Final assembling of the motor in all respect and testing by appropriate supply voltage
Less: Old scrap value.
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Both side Transportation and Handling Charge
Total impact of GST for the purpose of CTC
ROY ENTERPRISE
KEKA ARMATURE REPAIRING SHOP
techsummary_328492.pdf
PDF • 1.81 MB
finsummary_328492.pdf
PDF • 1.81 MB
E1529807.pdf
PDF • 1.81 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .