| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | -10.27% | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.6 CrAdmitted-Finance 302 1 SHIVKUTI PRAYAGRAJ | -1.25% | ₹5.6 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Not as per tender bid Document |
Tender Value
₹5.7 Cr
EMD Value
₹11.4 L
Closing Date
28 Feb 2026, 3:00 pmClosed
Executive Engineer
C.D. Prayagraj-02, UPAVP, Pratapgarh.
CONSTRUCTION WORK OF EXCELLENCE CENTRE AT GOVT. POLYTECHNIC, PRATAPGARH WITH COLLABORATION OF TATA TECHNOLOGY LIMITED (T.T.L).
2026_UPHDB_1111648_1
81/L-11/01 Dated 20.01.2026
Open Tender
Civil Works
Percentage
365 days
Govt. Polytechnic Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Executive Engineer, C.D. Prayagraj-02, UPAVP.
₹11.4 L
Yes
28 Feb 2026
2 Feb 2026
28 Feb 2026
2 Feb 2026
28 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil | 678 | CUM | 133.11 | ₹90,248.58 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 471 | CUM | 95.09 | ₹44,787.39 |
| 3 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 715 | SQM | 170.83 | ₹1,22,143.45 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 76 | CUM | 5,108.49 | ₹3,88,245.24 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 330 kg /cum | 404 | CUM | 7,127.85 | ₹28,79,651.4 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : | 884 | SQM | 294.08 | ₹2,59,966.72 |
| 7 | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 34,802 | KG | 74.73 | ₹26,00,753.46 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | 1,145 | CUM | 146.99 | ₹1,68,303.55 |
| 9 | LDPE sheet below concrete | 714 | SQM | 159.28 | ₹1,13,725.92 |
| 10 | Providing and laying Autoclaved Aerated concrete(AAC) blocks masonry with 150mm to 300 mm thick with Grade-1 AAC blocks of density 551 to 650 kg/cum conforming to IS:2185 (Part 3) in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). | 116 | CUM | 6,249.61 | ₹7,24,954.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_2054472.xls
BOQ • 0.58 MB
T.pdf
Tender Documents • 25.49 MB
F.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].