| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-AOC | ₹1.2 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ryan Engineering L1 | M MOHAMMED HAKKIM L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting the BT/CC surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 5 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officersetc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 13,437 | m2 | 84 ₹11.3 L | 87 ₹11.7 L |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 13,437 | m2 | 29 ₹3.9 L | 33 ₹4.4 L |
| 3.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 269 | m3 | 10,504 ₹28.3 L | 10,750 ₹28.9 L |
| 4.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate of required temperature and mixing the min required temperature incentral hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paverfinisher, Vibratory/ Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 404 | m3 | 10,935 ₹44.2 L | 11,300 ₹45.7 L |
Updated dates
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
28 Jan 2026, 3:00 pmClosed
COMMISSIONER TIRUNELVELI CORPORATION
Main office S.N.High road Tirunelveli Corporation
Renewal ofB.T.Surface at South Chidambaram Nagar 3rd East Cross Street,South Chidambaram Nagar Cross Street,South Chidambaram Nagar 5th East Cross Street,South Chidambaram Nagar 6th Street,South Chidambaram Nagar 7th Street,South Chidambaram Nagar 8
2026_MAWS_642174_8
51/2025-26
Open Tender
Civil Works - Roads
Main office S.N.High road Tirunelveli Corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹1.1 L
Main office S.N.High road Tirunelveli Corporation
25 Mar 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
14 Jan 2026
Charges for cutting the BT/CC surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 5 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officersetc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate of required temperature and mixing the min required temperature incentral hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paverfinisher, Vibratory/ Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
12biddocument.pdf
Tender Documents • 0.71 MB
BOQ_769250.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid