Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹29.5 L+₹2.5 L (9.35%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 Bidder | |
| 3 | L3₹31.3 L+₹4.3 L (16.0%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 Bidder | |
| 4 | L4₹32.2 L+₹5.3 L (19.5%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 Bidder | |
| 5 | L5₹32.9 L+₹5.9 L (21.9%)Rejected-Finance | L5 | Rejected-Finance Not Being L1 Bidder |
| Sl No | Description | Qty | Unit | s l sharma and sons L4 | M/S Inderjit Sharma and Co. L7 | VIRINDER SINGH L8 | vmd traders L2 | M/s AKHIL SHARMA L1 | MAHADEV ENTERPRISES L6 | BHAGWATI TRADERS L5 | M/S SACHKHAND ROAD SERVICE L9 | M/s Susheel Kumar Govt. Contractor L3 | A V CONSTRUCTION L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water complete all as specified and directed by Engr-in-Charge . | 830 | Sqm | 10 ₹8,300 | 12 ₹9,960 | 5 ₹4,150 | 2 ₹1,660 Lowest | 10 ₹8,300 | 10 ₹8,300 | 7 ₹5,810 | 2 ₹1,660 Lowest | 14 ₹11,620 | 15 ₹12,450 |
| 2.00 | Demolition of brickwork or stone/ boulder masonry, build in cement mortar including all quoins, arches, pillars etc, but excluding ashlars facings, dressed stonework complete all as specified and directed by Engr-in-charge. | 141.6 | Cum | 100 ₹14,160 | 150 ₹21,240 | 100 ₹14,160 | 50 ₹7,080 | 50 ₹7,080 | 200 ₹28,320 | 125 ₹17,700 | 10 ₹1,416 Lowest | 95 ₹13,452 | 250 ₹35,400 |
| 3.00 | Demolition of cement concrete of any description not other wise described for and specifically . | 26.56 | Cum | 100 ₹2,656 | 250 ₹6,640 | 100 ₹2,656 | 50 ₹1,328 | 50 ₹1,328 | 200 ₹5,312 | 125 ₹3,320 | 20 ₹531.2 Lowest | 95 ₹2,523.2 | 500 ₹13,280 |
| 4.00 | Excavation in post holes or similar holes each n exc 0.5 cum getting out in any type of soil (Dimension .450x.450x.800) | 192.4 | Each | 200 ₹38,480 | 100 ₹19,240 | 150 ₹28,860 | 100 ₹19,240 | 60 ₹11,544 | 120 ₹23,088 | 280 ₹53,872 | 40 ₹7,696 Lowest | 120 ₹23,088 | 60 ₹11,544 |
| 5.00 | Surface excavation in soft /loose soil n exc 30 cm deep and averaging 15 cm deep and getting out in soft/loose soil | 1 | Sqm | 50 ₹50 | 50 ₹50 | 10 ₹10 Lowest | 100 ₹100 | 20 ₹20 | 30 ₹30 | 50 ₹50 | 100 ₹100 | 240 ₹240 | 91.25 ₹91.25 |
| 6.00 | Excavation in trenches n.exc 1.5m wide and n.exc 1.50m deep and getting out in Hard soil. | 10 | Cum | 250 ₹2,500 | 160 ₹1,600 | 200 ₹2,000 | 100 ₹1,000 Lowest | 100 ₹1,000 Lowest | 150 ₹1,500 | 150 ₹1,500 | 200 ₹2,000 | 240 ₹2,400 | 200 ₹2,000 |
| 7.00 | Removing excavated material exc. 250 m but n exc. 500 m and depositing where directed Complete all as specified and directed by Engr-in-Charge. | 4.15 | Cum | 100 ₹415 | 70 ₹290.5 | 30 ₹124.5 Lowest | 100 ₹415 | 100 ₹415 | 90 ₹373.5 | 150 ₹622.5 | 200 ₹830 | 90 ₹373.5 | 100 ₹415 |
| 8.00 | Returning, filling in, including spreding, levelling, watering and well ramming in layers n.exc 25cm all as specified and directed by Engr-in-Charge. | 6 | Cum | 50 ₹300 | 50 ₹300 | 60 ₹360 | 100 ₹600 | 100 ₹600 | 90 ₹540 | 125 ₹750 | 200 ₹1,200 | 90 ₹540 | 20 ₹120 Lowest |
| 9.00 | Hard core of gauge not exc 63mm deposited, spread and levelled in layers not exc. 15 cm thick, watered and rammed to a true surface of 100mm thick with broken/stone/boulers. | 22.5 | Cum | 1,000 ₹22,500 | 2,000 ₹45,000 | 850 ₹19,125 | 555 ₹12,487.5 | 800 ₹18,000 | 1,200 ₹27,000 | 880 ₹19,800 | 500 ₹11,250 Lowest | 820 ₹18,450 | 1,800 ₹40,500 |
| 10.00 | M&L, Hard core of broken stone or boulders of gauge exc 63 mm but n exc 100 mm deposited spread and levelled in layers n exc 15 cm thick watered and rolled / rammed to a true surface. | 44.49 | Cum | 1,000 ₹44,488 | 2,000 ₹88,976 | 850 ₹37,814.8 | 800 ₹35,590.4 | 520 ₹23,133.76 Lowest | 1,200 ₹53,385.6 | 895 ₹39,816.76 | 700 ₹31,141.6 | 820 ₹36,480.16 | 1,800 ₹80,078.4 |
Tender Value
Refer Docs
EMD Value
₹88,000
Closing Date
25 Jun 2026, 6:00 pmClosed
GE SOUTH UDHAMPUR
GE SOUTH UDHAMPUR
ADDN ALTN TO DRAINAGE SYS WITH ALLIED INFRA NEAR OTM LINE AREA BLDG NO P 163 P 164 P 165 AT 4 PARA SF AND OTHER SANCTION WORK UNDER GE SOUTH UDHAMPUR
2026_MES_769907_1
GE/S(U)-56/2026-27
Open Tender
Civil Works
Works
180 days
GE SOUTH UDHAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SOUTH UDHAMPUR
₹88,000
Yes
30 Jul 2026
5 Jun 2026
26 Jun 2026
5 Jun 2026
25 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water complete all as specified and directed by Engr-in-Charge . | 830 | Sqm | - | - |
| 2 | Demolition of brickwork or stone/ boulder masonry, build in cement mortar including all quoins, arches, pillars etc, but excluding ashlars facings, dressed stonework complete all as specified and directed by Engr-in-charge. | 141.6 | Cum | - | - |
| 3 | Demolition of cement concrete of any description not other wise described for and specifically . | 26.56 | Cum | - | - |
| 4 | Excavation in post holes or similar holes each n exc 0.5 cum getting out in any type of soil (Dimension .450x.450x.800) | 192.4 | Each | - | - |
| 5 | Surface excavation in soft /loose soil n exc 30 cm deep and averaging 15 cm deep and getting out in soft/loose soil | 1 | Sqm | - | - |
| 6 | Excavation in trenches n.exc 1.5m wide and n.exc 1.50m deep and getting out in Hard soil. | 10 | Cum | - | - |
| 7 | Removing excavated material exc. 250 m but n exc. 500 m and depositing where directed Complete all as specified and directed by Engr-in-Charge. | 4.15 | Cum | - | - |
| 8 | Returning, filling in, including spreding, levelling, watering and well ramming in layers n.exc 25cm all as specified and directed by Engr-in-Charge. | 6 | Cum | - | - |
| 9 | Hard core of gauge not exc 63mm deposited, spread and levelled in layers not exc. 15 cm thick, watered and rammed to a true surface of 100mm thick with broken/stone/boulers. | 22.5 | Cum | - | - |
| 10 | M&L, Hard core of broken stone or boulders of gauge exc 63 mm but n exc 100 mm deposited spread and levelled in layers n exc 15 cm thick watered and rolled / rammed to a true surface. | 44.49 | Cum | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TENDER56.pdf
Tender Documents • 1.25 MB
BOQ_862180.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .