| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-Finance L1 | |
| 2 | L2₹15.5 L+₹19,300 (1.26%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.6 L+₹34,050 (2.23%)Rejected-Finance GANGYAL JAMMU | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
Closing Date
28 Jul 2021, 4:00 pmClosed
office of xen jal shakti phe mech div north jmu
office of xen jal shakti phe mech div north jmu
PITC of 50,000 GPH x 122 mtrs. Head HC pumpset along with allied electromechanical works at CPS Muthi village under UT UPD Capex Budget
2021_PHE_130451_1
e nit no. 84 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
30 days
muthi village
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
office of xen jal shakti phe mech div north jmu
Exempted
14 Aug 2021
12 Jul 2021
29 Jul 2021
12 Jul 2021
28 Jul 2021
12 Jul 2021
Amount
Installation, testing and commissioning of 50,000 GPH x 122 mtrs. head HC pumpset (Make: KSB/KIRLOSKAR) at CPS Muthi Village by way of dismantling of non functional unit by cutting / old rusted bolts with help of gas cutter and extracting of pump motor from base frame and shifting the old machinery to stacking place with the help of manual labour and crane, dismantling of sluice valve/reflux valve. Strengthening of Foundation Block and Base Frame:-The job includes strengthening of existing foundation block and base frame by way of demolishing the existing block for repair by using pneumatic hammer, high carbon steel chisels and sledge hammer upto required depth. Disposal of excavated material outside the pump room upto a lead of 200 mtrs. by head load carriage.. fitting of new base frame over the existing steel reinforcement, leveling it both longitudinal and latitudinal strengthening of base frame by providing and welding of M.S Channel cross members of required size as per size of frame for giving extra strength against vibrations of unit on full load conditions and making proper alignment then fastening with the anchor bolts using hexagonal fasteners with washers. The job further includes laying of M–15 grade cement concrete block (1 cement , 1½ coarse sand & 3 graded stone including binding chemical) upto the bottom flange of base frame from outside and upto the top level from inside the base frame then plastering the exposed surface of block and curing to achieve the proper strength. Installation:-The job further includes installation/Handling / shifting of pumping machinery from stacking place to site of work i.e. near the foundation block. Placing the pump and motor on the base frame by using crane, skilled manpower and other tools and tackles. Leveling of pump and motor properly making alignment of the pump and motor on base frame and fastening with base frame after providing and fitting of superior quality hexagonal fasteners with washers. The job further includes fitting of gland packing and tightening the gland bush firmly to both DE and NDE side, greasing the bearings using grease gun properly and fitting of cover plates to DE and NDE side of both motor and pump. Making of all the electrical connections and testing the running of motor on no load then coupling the motor with pump by way of matching both the pulleys after providing and fitting of coupling bolts with rubber bushes then testing and commissioning on full load condition after ensuring the necessary incoming of water from suction line to the impeller after removing the air lock by operating the air vent valve. Suction line: Fabrication of suction line by modifications of already laid suction 150 mm dia by fabrication of M.S flanges as per the size of pump suction and drilling of holes to match the suction flange of pump the job includes fabrication of bend and flange, flanged nipple as per the site requirement for free flow of water. Job includes p/f of new sluice valve 150 mm in suction pipe by nuts and bolts and gasket sheet, all the welding joint should be welded with good quality electrodes in double layer to make joint leak proof. Delivery Line- Fabrication of Delivery line by modifications of already laid delivery 150 mm dia by providing and fabrication of M.S pipe bends for v-butt welding joint and also includes fabrication of M.S flange compatible to the delivery flange of pump out of M.S plate flanges and drilling of holes to match the delivery flange of pump the job includes fabrication of M.S bend and flange compatible to the delivery flange of pump .Job includes fabrication of bends and flange nipple for p/f sluice valve and check valve in delivery line by p/f of new nuts ,bolts and gasket sheet flanged nipple as per the site requirement for free flow of water. Job includes p/f of new sluice valve and check valve of 150mm dia each in delivery line pipe by p/f nuts and bolts and gascut sheet, all the welding work shall have to be executed by good quality electrodes in double layer to make joint leak proof. Painting:- Scratching of rusted portion by emery papers on suction and delivery pipes and making an even surface for painting of the pumping equipment. Painting of all the suction, delivery pipes with one coat of red oxide and then painting of all the pumping equipment with two coats of synthetic enamel. i.e. suction delivery, sluice valves, reflux valve, etc. Job including cost of material and labour charges. This complete mechanical and electrical job must be done by highly trained technicians and includes cost of H.C Pumpset, material, labour charges, crane charges,tool and tackles and inclusive of all taxes.
Description of Panel:-Fabrication, installation, testing and commissioning of LT control panel cum star delta starter for operation of 180 HP Motor at CPS Muthi Village. The panel shall be steel sheet enclosed dust and vermin proof fabricated out of 14/16 SWG pressed and shaped CRCA sheet steel supported on MS angle of 75 mm ISMC of suitable size and provision for fixing it on the ground with the help of foundation bolts. Panel edges and door edges shall be reinforced against distortion. The panel should be sturdy enough for vibration free operation and should be equipped with suitable locking / sealing arrangements. The structure should be provided suitable entry and exit holes for incoming and outgoing cables. The panel should be given two coats of anti rust primer and two coats of powdered coated steel grey paint. The panel should be equipped with following components. Incoming Panel box: The incoming panel box should be fitted with an MCCB of 630 Ampere. Capacity having display with ON / OFF, trip indicating light, digital Multi function meter with communication port (RJ485), digital voltmeter, digital ammeter, control fuse etc. of approved make L&T,GE spectronics / Schneider/HPL/C&S. Star Delta starter: The panel should be fitted with a fully automatic star delta starter comprises air break contactor of 02 Nos. MNX-400 air break contactors of each for main and delta supply and 1 No. MNX-325 air break contractor for star operation,1 No. timer for change over the supply of motor from star to delta, 2 nos. push buttons for start and stop operation of motor, 3 Nos. indicators for status of starter i.e. running, tripped, by passed / in line of protection system.1No.MCB 2 Amps. for the protection of internal control wiring. Complete accessories of approved make L&T, GE spectronics / Schneider/HPL/C&S. Neat and clean internal control wiring should be made with flexible copper cables to complete the star delta circuit of outgoing supply. Protection devise: The panel should be fitted with protections devices like relay, CT/PT, timer, ROM of suitable rating having inbuilt display ON/OFF, control fuse, fault analyzer with capacity to protect motor by isolating the power supply of motor by de-energizing the starter / panel from following electromechanical faults which may otherwise damage the motor windings:- a. Voltage related fault:- Single phasing, under voltage, over voltage, unbalance voltage / reverse phasing. b. Current related fault:- Over current / load, dry running, unbalance current / load, earth leakage,short circuiting. c. Mechanical fault:- Locked rotor, broken shaft. d. Displays :- the panel should provision for Display line current of RYB phase and also line voltage of RY and YP phase. e. Display and record trip counts and indicate trip status for over load, under load, single phase, unbalance, earth fault, over voltage, under voltage / reverse phasing receptively. f. Analyze, display and records No. of operation and duration of motor running. Complete accessories of reputed make L&T, GE spectronics / Schneider/HPL/C&S. Bus Bar:- The bus bar shall be hard drawn high conducive tinned copper of uniform cross section as per IS 613-1984. All bolted electrical joints shall be secured by corrosion proof steel fasteners. All bolts, nuts, washers and studs shall be galvanized. Bus bar shall be sequence marked in colour from front and back in Red, Yellow and Blue. Neutral bus bar shall be marked black. The bus bar shall be spaced and staggered in such a way that installation of MCCB and associated cables can be achieved without any difficulty using common tool. Bi metal overload relay :-A bimetal over load relay of suitable range should be fitted with in the starter as an extra protection to protect the motor in case of failure of fault analyzer with an isolation / bye pass switch to bye pass the fault analyzer. Installation :- In addition to this the panel cum star delta starter should be properly installed at pumping station on floor as per site provision foundation bolts in ground. The MCCB should be connected with main outgoing of voltage stabilizer after necessary thimbling of the cable ends. The starter should be connected with main incomer MCCB with bus bar / copper flexible cable arrangement of adequate current carrying capacity. The bus bar / cable should be fitted with the help of insulators into the panel firmly to withstand any short circuit stresses. All other components i.e. meters, indicators, push buttons, protection relays, operation coils of contactors etc. should be connected with flexible copper cable to complete the circuit for operating the motors. All the internal wiring should be neat and clean. Complete job includes cost of material, labour charges and transportation of panel from workshop to pumping station at site of work. The job also includes testing / setting of protection panel at different loads. Job further includes providing and fitting of cables of assorted sizes as per the site requirement. Complete job includes cost of material and labour charges.
Shivam enterprises
HITECH MECHNICALS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .