| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.2 LAccepted-AOC | L1 | Accepted-AOC L1 quoted less than tender value | |
| 2 | L2₹78.7 L+₹1.5 L (1.94%)Rejected-AOC NO 60 PILLAYAR KOVIL STREET THONDANTHULAS VILLAGE POST KATPADI TALUK VELLORE DISTRICT 632202 | VELLORE | VELLORE | TAMIL NADU | 632202 | L2 | Rejected-AOC L2 quoted greater than tender value |
| Sl No | Description | Qty | Unit | K.Suresh L2 | KAY YES CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Strengthening the Road from NP Road to Nethimariyamman Koil Road Via Kudisai in Elavambadi Panchayat of Anaicut Block. Km 0/0 - 1/200 (R-27) | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 1,724.54 | sqm | 6.48 ₹11,175.02 | 6.36 ₹10,968.07 Lowest |
| 3.00 | Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 1,197.6 | sqm | 23.8 ₹28,502.88 | 23.35 ₹27,963.96 Lowest |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 161.68 | cum | 346.23 ₹55,978.47 | 339.64 ₹54,913 Lowest |
| 5.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 323.35 | cum | 143 ₹46,239.05 | 140.28 ₹45,359.54 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 449.1 | cum | 2,702.13 ₹12,13,526.58 | 2,650.68 ₹11,90,420.39 Lowest |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 3,592.8 | sqm | 86.44 ₹3,10,561.63 | 84.8 ₹3,04,669.44 Lowest |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 3,592.8 | sqm | 20 ₹71,856 | 19.62 ₹70,490.74 Lowest |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 89.82 | cum | 11,787.39 ₹10,58,743.37 | 11,562.96 ₹10,38,585.07 Lowest |
| 10.00 | Provision for K.M. stone | 1 | nos | 2,516.68 ₹2,516.68 | 2,468.77 ₹2,468.77 Lowest |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
8 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Vellore
The Project Director DRDA Vellore
Vellore District Strengthening of 3 roads in Anaicut Block under MGSMT phase III 2025-26 scheme, package no 09
2025_RDTN_594039_1
DIPR/4437/TENDER/2025
Open Tender
Civil Works
Item Rate
180 days
The Project Director DRDA Vellore
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹85,000
14 Oct 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
Amount
Strengthening the Road from NP Road to Nethimariyamman Koil Road Via Kudisai in Elavambadi Panchayat of Anaicut Block. Km 0/0 - 1/200 (R-27)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for K.M. stone
Provision for H.M. stone
60 cm Equilateral triangle cautionary signboard
Road Marker /Road stud with lens Reflector
Construction of RCC Slab Culvert (1.50m Vent) at Ch 0/790
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing tar Paper for for bearing Between Bed block & Deck Slab slab
Strengthening the Road from KR Road - Sathiyamangalam to Pattikaranpatti Road in Sathiyamangalam Panchayat at Anaicut Block. Km 0/0 - 0/650 (R-110)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for H.M. stone
60 cm Equilateral triangle cautionary signboard
Strengthening the Road from Pilliyar kuppam to BG Road in Poigai Panchayat (R - 102). Km 0/0 - 0/550 at Anaicut Block
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for H.M. stone
Provision for Crash Barrier
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Suresh (BID ID -1450775)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .