Loading…
Loading…
Tender Value
Refer Docs
Closing Date
19 Sept 2026, 9:00 am4d left
Maj Vivek Sharma
GE MH AND RH KHADKI PUNE 411003
REPAIRS/ REPLACEMENT OF SEWAGE LINES, MANHOLES, SEPTIC TANKS/ SOAK WELLS AND OTHER MISC WORKS AT AUNDH MIL STATION UNDER GE (MH AND RH) KHADKI
2026_MES_785872_1
8840/E8
Open Tender
Civil Works
Item Rate
180 days
GE MH AND RH KHADKI
As per tender documents
8 documents required · 8 mandatory
₹500
GE MH AND RH KHADKI
Exempted
19 Sept 2026
22 Aug 2026
22 Sept 2026
22 Aug 2026
19 Sept 2026
5 Sept 2026
22 Aug 2026 - 12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and clearing of bore underground Main sewage line/Branch sewer line from any type of trap including (WCs /Gully trap /floor trap/CI pipes /nahani Trap/Bathrooms) to 1st manhole including trap & manhole of any depth by taking off manhole covers and re-fixing the same after cleaning of any descripton , underground and any depth by removing any type of blockage including de-silting and de-chocking sludge/sludge water shall be disposed off by using mechanically or pumping out sewage from block manholes where authorised dumping site declared by local adminstration outside MoD land distance exceeding 2Km but n, exc 2.5 Km complete all as specifed and as directed.
Note : - (i) The contractor shall deploy Minimum, experienced 01 safaiwala alongwith T & P (i.e Iron seweage line cleaning Rod set -02 Nos, Kassi, Genti, Crow bar, safety hand gloves, safety shoes and other tools for all members on regular basis to attend complaint cell/service centre (Range Hill area) of AGE B/R (W) under GE MH & RH Kirkee area daily between 0830 to 0900 hrs as per direction of Engr-in-Charge.
(ii) The complaint shall be attended preferably on the same day and complaint slips duly signed by the user will be deposited back with JE (Civil) on the same day. (iii) Working time for all the people employed by the contractor will be from 0900 hrs to 1700hrs in case of any emergency, they can be called at any time beyond specifed time and will be given off at the descretion of Engr-in-Charge.
(iv) A penalty of Rs. 629/- per day per person will be levied in case of absence of any of safaiwala or helper.
(v) Manpower /employees deployed by contractor shall have safety measures for the job and life insurance policy for compensation in case of any accident. The cost for the same is deemed to be included in the unit quoted rate by the bidder. No extra claim will be entertained by the Department. (vi) The payment towards the subject items shall only be made as per the total number of days, contractor had cleaned and cleared the blockages of sewage line. (vii) Contractor shall maintain a register including details of day of cleaning of sewage line, duly signed by contractor and Engineer-in-Charge or his Rep. | 225 | Per day | - | - |
| 2 | Cleaning and clearing of bore underground Main sewage line/Branch sewer line from any type of trap including (WCs /Gully trap /floor trap/CI pipes /nahani Trap/Bathrooms) to 1st manhole including trap & manhole of any depth by taking off manhole covers and re-fixing the same after cleaning of any descripton , underground and any depth by removing any type of blockage including de-silting and de-chocking sludge/sludge water shall be disposed off by using mechanically or pumping out sewage from block manholes where authorised dumping site declared by local adminstration outside MoD land distance exceeding 2Km but n, exc 2.5 Km complete all as specifed and as directed.
Note : - (i) The contractor shall deploy Minimum, experienced 01 helper alongwith T & P (i.e Iron seweage line cleaning Rod set -02 Nos, Kassi, Genti, Crow bar, safety hand gloves, safety shoes and other tools for all members on regular basis to attend complaint cell/service centre (Range Hill area) of AGE B/R (W) under GE MH & RH Kirkee area daily between 0830 to 0900 hrs as per direction of Engr-in-Charge.
(ii) The complaint shall be attended preferably on the same day and complaint slips duly signed by the user will be deposited back with JE (Civil) on the same day. (iii) Working time for all the people employed by the contractor will be from 0900 hrs to 1700hrs in case of any emergency, they can be called at any time beyond specifed time and will be given off at the descretion of Engr-in-Charge.
(iv) A penalty of Rs. 629/- per day per person will be levied in case of absence of any of safaiwala or helper.
(v) Manpower /employees deployed by contractor shall have safety measures for the job and life insurance policy for compensation in case of any accident. The cost for the same is deemed to be included in the unit quoted rate by the bidder. No extra claim will be entertained by the Department. (vi) The payment towards the subject items shall only be made as per the total number of days, contractor had cleaned and cleared the blockages of sewage line. (vii) Contractor shall maintain a register including details of day of cleaning of sewage line, duly signed by contractor and Engineer-in-Charge or his Rep. | 225 | Per day | - | - |
| 3 | M&L for Cleaning of all blockage of any type of trap, water closet, soil waste/ vent pipe, gully traps upto first manhole by removing all chockage and removing the same to a distance exceeding 100m and not exceeding 200m and making good the distrurbed surfaces as per existing where required all as per directed by Engg-In-Charge | 3,200 | Job | - | - |
| 4 | Cleaning of existing 150mm dia sewage line upto 1.00 m depth from ground level using jute or PVC nylon rope with knot at one end and other end free passed through the line or by rodding & removing all liquid/semi solid /solid sludge etc coming in the next manhole is removed and then the line is cleaned with water complete for effectve functioning all as directed by EIC. Note : Quoted rates shall be include working in foul condition. | 3,000 | RM | - | - |
| 5 | All as per Item No 04above but 150 mm dia bore but depth exc. 1.0 m below ground level complete. | 3,000 | RM | - | - |
| 6 | All as per Item No 04 above but 200 mm dia bore but depth upto 1.50m below ground level complete. | 1,000 | RM | - | - |
| 7 | All as per Item No 04 above but exc. 200 mm dia bore but n.exc 300 mm dia SWG/RCC line and upto a depth of 2.50 m. | 1,000 | RM | - | - |
| 8 | Cleaning of existing manholes of any size upto depth of 1.0 m from top of manholes and removing all semi solid or solid material of any description and cleaning the manholes from inside complete with water etc complete all as directed by EIC.
Note : Quoted rates shall be include working in foul condition. | 2,500 | Each | - | - |
| 9 | All as per item No 08 above but depth of manholes exceeding 1.0m but n exc 2.5 m. | 500 | Each | - | - |
| 10 | Cleaning and de-sludging of existing septic tank/ deep manholes upto 3mtr deep including taking out sludge in any form alongwith all other foreign materials by mechanical equipment or manually or by way of any other suitable means including removal of sludge and other foreign materials out side the MD land by any means complete (working in foul condition) all as specified & directed. | 300 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
T8840.pdf
Tender Documents • 0.91 MB
BOQ_880639.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .