Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | -15.10% | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 L+₹45,894.46 (6.01%)Admitted-Finance C 8 OPP SALES TAX OFFICE HAKIKAT NAGAR SAHARANPUR SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | -10.00% | ₹8.1 L+₹45,894.46 (6.01%) | L2 | Admitted-Finance |
| 3 | L3₹8.4 L+₹78,878.01 (10.3%)Admitted-Finance | -6.33% | ₹8.4 L+₹78,878.01 (10.3%) | L3 | Admitted-Finance |
| 4 | L4₹8.7 L+₹1.1 L (13.9%)Admitted-Finance | -3.33% | ₹8.7 L+₹1.1 L (13.9%) | L4 | Admitted-Finance |
| 5 | L5₹8.8 L+₹1.2 L (15.7%)Admitted-Finance | -1.75% | ₹8.8 L+₹1.2 L (15.7%) | L5 | Admitted-Finance |
Tender Value
₹9.0 L
EMD Value
₹89,972
Closing Date
3 Aug 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of nala covered, side patri interloking tiles from amrut taal vatika and in front of gujjar bhawan delhi road at ward no.04
2026_NNSAH_1170336_1
6181 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹89,972
9 Sept 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 2.1 | cum | 4,520 | ₹9,492 |
| 2 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 6 | sqm | 160 | ₹960 |
| 3 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 0.35 | cum | 5,750 | ₹2,012.5 |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work | 23.01 | m3 | 7,400 | ₹1,70,274 |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 18.06 | qtl | 8,529 | ₹1,54,033.74 |
| 6 | M.S or iron work @50kg/sqm | 1,413.3 | kg | 61.5 | ₹86,917.95 |
| 7 | Construction of granular sub base by providing cloase garded material conforming to specification in all complete work | 30 | cum | 2,015 | ₹60,450 |
| 8 | Supply of 80mm thick C.C. Interloking Rubber MouledeTiles ISI marked shaped as per PWD Schedule Chapter-20 of 01-07-2016 page 43 S.I. No 20.36 New item 12 page no 43 including laying of Tiles cushan with local sand in all complete (as page 43 new item 16 | 240 | sqm | 820 | ₹1,96,800 |
| 9 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete | 9 | cum | 7,300 | ₹65,700 |
| 10 | Painting or varnishing work in small area or new with Two coat of approved suprior quality | 177.87 | sqm | 89 | ₹15,830.43 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2196081.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .