Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.3 LAdmitted-Finance 610 3 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | +11.77% | ₹35.3 L | L1 | Admitted-Finance |
| 2 | L2₹36.5 L+₹1.3 L (3.59%)Admitted-Finance 1550 3 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | +15.78% | ₹36.5 L+₹1.3 L (3.59%) | L2 | Admitted-Finance |
Tender Value
₹31.5 L
EMD Value
₹63,080
Closing Date
9 Jun 2026, 11:00 amClosed
Nidhi bhardwaj
Horticulture Panchkula
Development of Green Belt along GT Road in Sec-5, Karnal (Providing and fixing of Grill Fencing on brick toe Wall , main gate , wicket gate with three year mtc and defect liability period free of cost and all other works contingent thereto.) Pocket-I
2026_HBC_524575_1
2026F1C9F19D A710 4AC8 A364 6A4EBF8F13A7263HSV
Open Tender
Civil Works
Works
120 days
Karnal
2 documents required · 2 mandatory
₹2,000
₹63,080
Yes
10 Jun 2026
26 May 2026
10 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.1]Cement Concrete 1:8:16 Flooring 1. Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. [Through Rate] | 40.8 | cum | 1,727 | ₹70,461.6 |
| 2 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate] | 1,020 | Sqm | 79 | ₹80,580 |
| 3 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 1,020 | Sqm | 138 | ₹1,40,760 |
| 4 | [11.63]Distempering with dry distemper of approved brand and manufacture (two or more coats) of required shade on new work, over and including water thinnable priming coat to give an even shade. [Through Rate] | 2,040 | Sqm | 29 | ₹59,160 |
| 5 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] | 720 | Sqm | 31 | ₹22,320 |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 10,800 | Kg. | 83 | ₹8,96,400 |
| 7 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum [Through rate] | 10 | Per day | 6,493 | ₹64,930 |
| 8 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 204 | cum | 78 | ₹15,912 |
| 9 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 11.18 | cum | 3,875 | ₹43,322.5 |
| 10 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate] | 97.2 | Sqm | 261 | ₹25,369.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_603523.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .