Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78,787.37Admitted-Fee/PreQual/Technical/Finance | -21.00% | ₹78,787.37 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹99,631.12+₹20,843.75 (26.5%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹99,631.12+₹20,843.75 (26.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹99,720.88+₹20,933.51 (26.6%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹99,720.88+₹20,933.51 (26.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.0 L
EMD Value
₹14,060
Closing Date
24 Aug 2026, 4:00 pmClosed
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Stage contract for maintenance of Roads and bridges P/L of RCC pipes/Clearance of drains, repair/renovation of drains, R/walls, Slip clearance Part-II of Rand B Division Tangdar
2026_PWDJK_321009_1
ENIT 53 RnB Div Tangdar 2026-27 Stage contact
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
Convener, purchase committee, Directorate of ISM
₹14,060
Yes
25 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing of water proof Shamyana incl all carriages fixing/ fittings as required etc complete job Shamyanas incl carpets small/ medium size complete job incl providing and fixing of sun shade infront of VIP Stand of required size and shade as per the direction of engineer in-charge . incl all carriages | 1 | sft | 20 | ₹20 |
| 2 | Providing and fixing of water proof Shamyana incl all carriages fixing/ fittings as required etc complete job shayamanan incl carpets big size as per the direction of engineer incharge .incl all carriages | 1 | sft | 18 | ₹18 |
| 3 | Hiring charges of Sofa set at the venue all carriagese incl all carriages, loading/unloading, upto the venue etc complete job. | 1 | set | 2,000 | ₹2,000 |
| 4 | Hiring charges of Plastic chairs at the venue incl all carraiges, loading/unloading, upto the venue complete job. | 1 | No | 50 | ₹50 |
| 5 | Hiring charges of officer chairs/walnut chairs at the venue incl all carraiges, loading/unloading, upto the venue complete job. | 1 | No | 120 | ₹120 |
| 6 | Hiring charges for providing, transporting, and setting up VVIP walnut chair with inscribed national emblem at the venue, inclusive of all carriage, loading/unloading, installation on a complete job basis. | 1 | No | 1,500 | ₹1,500 |
| 7 | Hiring charges of officer Table at the venue incl all carraiges,loading/unloading, upto the venue complete job. | 1 | No | 450 | ₹450 |
| 8 | Hiring charges of Superior Table at the venue incl all carraiges,loading/unloading, upto the venue complete job. | 1 | No | 1,000 | ₹1,000 |
| 9 | Hiring charges Superior tables at the venue incl all carriages,loading/unloading, upto the venue complete job | 1 | No | 850 | ₹850 |
| 10 | Hiring charges for providing, transporting, and setting up a podium table at the venue, inclusive of all carriage, loading/unloading, installation on a complete job basis. | 1 | No | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1069290.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .